Coal Burner/Coal Powder Burner/Pulverized Coal Burner
USD $3,000 - $30,000 /Set
Min.Order:1 Set
Zhengzhou Dayu Machinery Co., Ltd.
Coal Burner/Coal Powder Burner/Pulverized Coal Burner
Zhengzhou Dayu Machinery Co., Ltd is a professional construction machinery for Asphalt Plant and Coal Powder Burner over 20 years. we are top 1 of China
Dayu Asphalt Plant Spare Parts have mainly four groups:
1, Coal Burner/Coal Powder Burner/Pulverized Coal Burner
2, Drying Drum of the asphalt plant spare parts
3, Baghouse dust collector of the asphalt plant spare parts
4, Diesel oil burner of the asphalt plant spare parts
Coal Burner/Coal Powder Burner/Pulverized Coal Burner
Used for 25-320 t/h asphalt mixing plant
RM series rotation type coal burner features:
1. Adopt new design structure, which changed the principle of traditional burner, adopt rotation type combustor to solve the imperfections of traditional burner(easy slagging, incomplete combustion);
2. High flame temperature, energy saving, burning sufficient;
3. Adopt high performance refractory brick, prolong service life;
4. 24 hours continuous production, no need do slag removal work everyday;
Production cost is low, the cost is only about 1/5 of the oil burner
Requirements of fuel
1. Use 0 # diesel for oil burning igniter
2. Requirements for the quality of coal using for burning:
1) Mark of coal: bituminous coal
2) Calorific value: ≥25kJ
- gross calorific value 7000 kcal/kg
- net calorific value 5000 kcal/kg
3) Yield of volatile matter: ≥25%
4) Permissible ash 8~10%
5) Total moisture 3~4%
6) Total sulphur ≤1%
7) Particle size: ≤20mm
Note: These indexes are the lowest requirements for the coal, the better coal will be better at practice.
3. Environment friendly:
Combustion completeness ≥95%,
Air black: Ringelmann 0-I grade, no harm to environment
FMJ series coal crusher
used for producing and supplying coal powder for coal burner.
Powder particle size: R90<20% (0.09mm)
General parameters of Coal Burner/Coal Powder Burner/Pulverized Coal Burner
Model | RM500 | RM1000 | RM1500 | RM2000 | RM3000 | RM4000 |
Power | 31.25 kw | 41.25 kw | 73.75 kw | 97.25 kw | 138.45 kw | 202.95 kw |
Rated coal consumption | 450 kg/h | 1000 kg/h | 1500 kg/h | 2000 kg/h | 2860 kg/h | 3660 kg/h |
Mixture temperature control | 130-180°C | 130-180°C | 130-180°C | 130-180°C | 130-180°C | 130-180°C |
Main machine | LTZ40 | LTZ80 | LTZ120 | LTZ160 | LTZ240 | LTZ320 |
Coal crusher | FMJ40 | FMJ80 | FMJ120 | FMJ120+ FMJ40 | 2*FMJ120 | 3*FMJ120 |
Oil burning igniter | RYDH | RYDH | RYDH | RYDH | RYDH | RYDH |
Distribution cabinet | PD40 | PD80 | PD120 | PD160 | PD240 | PD320 |
Combustion completeness | ≥95% | ≥95% | ≥95% | ≥95% | ≥95% | ≥95% |
Matching asphalt plant output | 25-40 t/h | 70-85 t/h | 100-125 t/h | 140-170 t/h | 200-250 t/h | 280-320 t/h |
Quality Control (QC):
Third Control
ISO9001:2000 Certificate
European CE Certificate
Environment Protection Design
Commercial Term:
Delivery Time : 30~40 Working Days
Payment Term : T/T or L/C
Transportation : by sea or railway in container.
After Sale Service:
Turn-Key Solutions
Erection & Commissioning Service
Operation Training Service
Spare Parts Supply (all working life)
Our Commitment:
1. Provide technical consultation service for customer, do well technical follow-up.
2. Installation, debug, and provide relevant technical training.
3. Strictly carry out three guarantees (guaranteed quality, guaranteed quantity and guaranteed repair).
4. Ensure spare parts and components available adequately and timely for all working life
Warranty Period : 18 months after install the plant.
More information can be get by contact with Zhengzhou Dayu Machinery Co.,Ltd