Coal Burner/Coal Powder Burner/Pulverized Coal Burner

Coal Burner/Coal Powder Burner/Pulverized Coal Burner

USD $3,000 - $30,000 /Set

Min.Order:1 Set

Supply Ability:
500 Set / Sets per Month
Port:
China Main Port
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Condition:
New
Place of Origin:
Henan, China
Brand Name:
Dayu Brand China Coal Burner
Model Number:
LB and DHB
Voltage:
adjustable
Power(W):
adjustable

Zhengzhou Dayu Machinery Co., Ltd.

Business Type: Trading Company
Zhengzhou Henan China
Main Products: Asphalt Mixing Plant ,Asphalt Batching Plant ,Mobile Asphalt Plant ,Concrete Mixing Plant ,Mobile Concrete Plant

Product Details

Specifications

Coal Burner/Coal Powder Burner/Pulverized Coal Burner
5.5-7kg/t
20-320T/H
ISO9001, ISO14001 CE,Gost
Coal Burner 20 years

   Coal Burner/Coal Powder Burner/Pulverized Coal Burner  

 
Company Information

Zhengzhou Dayu Machinery Co., Ltd is a professional construction machinery for Asphalt Plant and  Coal Powder Burner over 20 years. we are top 1 of China

 

Dayu Asphalt Plant Spare Parts have mainly four groups:

1, Coal Burner/Coal Powder Burner/Pulverized Coal Burner

2, Drying Drum of the asphalt plant spare parts

3, Baghouse dust collector of the asphalt plant spare parts

4, Diesel oil burner of the asphalt plant spare parts

 

 

 

 
Product Description

  

 

  Coal Burner/Coal Powder Burner/Pulverized Coal Burner

 

Used for 25-320 t/h asphalt mixing plant

RM series rotation type coal burner features:

1. Adopt new design structure, which changed the principle of traditional burner, adopt rotation type combustor to solve the imperfections of traditional burner(easy slagging, incomplete combustion);

2. High flame temperature, energy saving, burning sufficient;

3. Adopt high performance refractory brick, prolong service life;

4. 24 hours continuous production, no need do slag removal work everyday;

Production cost is low, the cost is only about 1/5 of the oil burner

 

 

 

 

 

Requirements of fuel

 

1. Use 0 # diesel for oil burning igniter

 

2. Requirements for the quality of coal using for burning:

 

   1) Mark of coal: bituminous coal  

 

   2) Calorific value: ≥25kJ

 

     - gross calorific value 7000 kcal/kg

 

     - net calorific value 5000 kcal/kg

 

   3) Yield of volatile matter: 25%

 

   4) Permissible ash 8~10%

 

   5) Total moisture 3~4%

 

   6) Total sulphur 1%

 

   7) Particle size: 20mm

 

Note: These indexes are the lowest requirements for the coal, the better coal will be better at practice.

 

3. Environment friendly:

 

Combustion completeness 95%,

 

Air black: Ringelmann 0-I grade, no harm to environment

 

 

 

FMJ series coal crusher

 

used for producing and supplying coal powder for coal burner.

 

Powder particle size: R90<20% (0.09mm)

 

 

 

 

 

General parameters of Coal Burner/Coal Powder Burner/Pulverized Coal Burner  

 

Model

RM500

RM1000

RM1500

RM2000

RM3000

RM4000

Power

31.25 kw

41.25 kw

73.75 kw

97.25 kw

138.45 kw

202.95 kw

Rated coal consumption

450 kg/h

1000 kg/h

1500 kg/h

2000 kg/h

2860 kg/h

3660 kg/h

Mixture temperature control

130-180°C

130-180°C

130-180°C

130-180°C

130-180°C

130-180°C

Main machine

LTZ40

LTZ80

LTZ120

LTZ160

LTZ240

LTZ320

Coal crusher

FMJ40

FMJ80

FMJ120

FMJ120+

FMJ40

2*FMJ120

3*FMJ120

Oil burning igniter

RYDH

RYDH

RYDH

RYDH

RYDH

RYDH

Distribution cabinet

PD40

PD80

PD120

PD160

PD240

PD320

Combustion completeness

95%

95%

95%

95%

95%

95%

Matching asphalt plant output

25-40 t/h

70-85 t/h

100-125 t/h

140-170 t/h

200-250 t/h

280-320 t/h

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 Coal Burner/Coal Powder Burner/Pulverized Coal BurnerCoal Burner/Coal Powder Burner/Pulverized Coal BurnerCoal Burner/Coal Powder Burner/Pulverized Coal BurnerCoal Burner/Coal Powder Burner/Pulverized Coal BurnerCoal Burner/Coal Powder Burner/Pulverized Coal BurnerCoal Burner/Coal Powder Burner/Pulverized Coal Burner

 

 Coal Burner/Coal Powder Burner/Pulverized Coal BurnerCoal Burner/Coal Powder Burner/Pulverized Coal BurnerCoal Burner/Coal Powder Burner/Pulverized Coal Burner

 

 

 
Our Services

  

 

 

Quality Control (QC): 

 

Third  Control

ISO9001:2000 Certificate

European CE Certificate

Environment Protection Design

 

Commercial Term: 

 

Delivery Time : 30~40 Working Days

Payment Term : T/T or L/C

Transportation : by sea or railway in container.

 

After Sale Service: 

 

Turn-Key Solutions

Erection & Commissioning Service

Operation Training Service

Spare Parts Supply (all working life)

  

Our Commitment:

 

1. Provide technical consultation service for customer, do well technical follow-up.

2. Installation, debug, and provide relevant technical training.

3. Strictly carry out three guarantees (guaranteed quality, guaranteed quantity and guaranteed repair).

4. Ensure spare parts and components available adequately and timely for all working life

 

 

Warranty Period :  18 months after install the plant. 

 

 

More information can be get by contact with Zhengzhou Dayu Machinery Co.,Ltd

 

  

 

 Coal Burner/Coal Powder Burner/Pulverized Coal Burner

 

 

 

 

 

 

 

 

 

 

 

Contact Supplier

Mr. Watson Bai Manager Chat Now
Telephone
0086-371-55635088
Mobile
0086-15237187379
Fax
0086-371-55635099
Address
No.18 Dongfeng Road Zhengzhou,Henan

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Engineering & Construction Machinery > Road Machinery > Asphalt Mixers
Categories
Hi~