Black powder coating aluminium fence glass post
USD $2,600 - $3,500 /Metric Ton
Min.Order:1 Metric Ton
Weifang Mario Industrial Trade Co., Ltd.
Items | Description | Notes |
1. Material | Aluminum 6063 T5 / 6063 T6 | Customized |
2. Profile thickness | 1.0mm-2.0mm or thermal break aluminum profiles | Customized |
3. Surface treatment | Anodizing, Powder coating, Electrophoresis painting, Fluoro carbon painting |
|
4. Hardware | Roto, G-U, Siegenia, Kinlong or local brand | Customized |
5. Color | Silver, powder coat white, or customized | RAL Standard |
6. Perforamcne parameters | Sounds insulation: RW ≥ 28 dB |
|
Wind pressure resistance: Third class GB/T7106 | 2.5Kpa | |
Air permeation resistance: Third class GB/T710 | 1.5m3/(mh) | |
Water resistance: Third class GB/T7108 | 350Pa | |
U value <1.1 - 2.2 |
| |
7. Applicable place | House, apartment, hotel, office, etc. |
Frame of window and doors :
About Weifang Mario Industrial Trade Co.,Ltd.
1. Founded in 2014, It will be responsible for the whole international export & import items of
Xinyudong Aluminium Co.,ltd. who has 12 years manufacturing experience;
2. 30 million RMB registered capital, 2 factories and 1000 employees;
3. ISO9001: 2008, ISO14001: 2004, ISO10012, AA grade standardize corporate;
4. 41 appearance patents, 2 utility model patents, 1 scientific and technological innovation;
5. “China Famous Brand ", “30 assured quality supplier brand ", “Shandong Famous Brand”.
Business Process:
Inquiry ----> Drawing ----> Mould Confirmation ----> Sample Confirmation ----> Placing Order ----> Delivery
Terms & Conditions of Trade:
1). Payment term: T/T, 30% down payment while balance shall be paid off before delivery.
2). Settlement term: Final payment shall be based on final actual physical weighing.
3). Delivery Time:
a). Die/Mould: 12 to 18 days after down payment & drawings are confirmed.
b). Production duration: 20 to 25 days after sample confirmed & down payment.
Location:No.333,Yudong Road,Dongcheng Street,Linqu County,Weifang City,Shandong Province.From Qingdao air port takes 1.5 hours to our factory.we will take car to pick you if you have plan come to visit us,and we will also arrange you hotel for free.