Grout Injection Packer 13*150mm
Grout Injection Packer 13*150mm
Grout Injection Packer 13*150mm
Grout Injection Packer 13*150mm

Grout Injection Packer 13*150mm

USD $0.1 - $0.5 /Piece

Min.Order:1000 Pieces

Supply Ability:
1000000 Piece / Pieces per Month
Port:
Shanghai
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
Shanghai, China
Brand Name:
RUTH
Model Number:
10*100mm

Shanghai Ruth Constructional Materials International Trading Co., Ltd.

Business Type: Trading Company
Shanghai China
Main Products: Waterproof Injection Machine ,Injection Packer ,Polyurethane ,Epoxy Resin ,Injection Machine Spare Parts

Product Details

Product Introduction   

Ruth high pressure two-rubber aluminum injection packers, HTA, gain its popularity in China market due to its cost-effectiveness, wide application field, high efficient, and fine environment adjustment. HTAs have two sizes in diameter, 10mm and 13mm; customizable length. HTA’s one-way nipple grease will activate with 10 Mpa. We suggest you to use HTA injection packers with our IEs injection machine.

 

Product Description

  1. 1.      Body Material: Aluminum/steel
  2. 2.      Nipple Grease Pressure: 10 Mpa /1465 psi / 100 bar
  3. 3.      Rubber Body: Two Pieces.

 

Specification 

Unit Sizes

Package

Net Weight

Gross Weight

10*80 mm

1500 pcs / Carton

19.0 kg / Carton

20 kg / Carton

13*85 mm

1000 pcs / Carton

22.5 kg / Carton

23 kg / Carton

13*100 mm

1000 pcs / Carton

24.5 kg / Carton

25 kg / Carton

13*150 mm

600 pcs / Carton

18.0 kg / Carton

19 kg / Carton

 

Other Common Injection Packers Sizes:

     10*100mm, 10*150mm, 13*95mm, 13*110mm, 13*115mm, 13*120mm, 13*130mm, 13*160mm, 13*250mm, 13*350mm, 13*450mm, etc.

      

 

Materials of Application

 

       Hydrophilic Polyurethane (WPU) and Hydrophobic Polyurethane (OPU) foam stop leakage agent, Epoxy Resin.

 

Application Field

 

 Subway Station, Tunnel, Culvert, Foundation Improvement, Soil Settlement, Reservoir, Port Project, Top Slab, Crack, Construction Join, Shrinkage Crack, Basement Hairline Crack, etc., water stop projects.

 

Notes during Applying

  1. 1.   Stop injecting if injected materials does not emit from the cracks after 5 minutes of application. Check for cross-drilled buried pipeline or other unnoticed holes.
  2. 2.   All application process should be closely watched. If the injection machine’s pressure remained high after releasing the valve on the connector, cracks and injection packers should be checked.

 

Transportation / Packing

 

Transportation by Air: Arrival within 2-7 days upon receipt of payment, excluding weekends and holidays.

Transportation by Ship: Delivery within 2-5 days upon receipt of payment, excluding weekends and holidays.

Packing Detail: 40 cartons per pallet (1*1 M)

Contact Supplier

Ms. Barbara Sheng Manager Chat Now
Telephone
86-21-63040008
Mobile
008615221025352
Fax
86-21-64033334
Address
RM 702,No.1189, WuzhongRD Shanghai

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Engineering & Construction Machinery > Other Construction Machinery
Categories
Hi~