Aluminium Mechanical Packers For Concrete Crack Repair

Aluminium Mechanical Packers For Concrete Crack Repair

USD $0.1 - $0.2 /Piece

Min.Order:1000 Pieces

Supply Ability:
1000000 Piece / Pieces per Month
Port:
Shanghai
Payment Terms:
T/T Credit Card

Quick Details View All >

Type:
waterproofing tools

Shanghai Ruth Constructional Materials International Trading Co., Ltd.

Business Type: Trading Company
Shanghai China
Main Products: Waterproof Injection Machine ,Injection Packer ,Polyurethane ,Epoxy Resin ,Injection Machine Spare Parts

Product Details

Product Description

Ruth high pressure two-robber aluminum injection packers, HTA, gain its popularity in China market due to its cost-effectiveness, wide application field, high efficient, and fine environment adjustment. HTAs have two sizes in diameter, 10mm and 13mm; customizable length. HTA’s one-way nipple grease will activate with 10 Mpa. We suggest you to use HTA injection packers with our IEs injection machine.

 

Product Description

  1. Body Material: Aluminum/steel
  2. Nipple Grease Pressure: 10 Mpa /1465 psi / 100 bar
  3. Rubber Body: Two Pieces.

 

Specification 

  

Unit Sizes

Package

Net Weight

Gross Weight

10*80 mm

1500 pcs / Carton

19.0 kg / Carton

20 kg / Carton

13*85 mm

1000 pcs / Carton

22.5 kg / Carton

23 kg / Carton

13*100 mm

1000 pcs / Carton

24.5 kg / Carton

25 kg / Carton

13*150 mm

600 pcs / Carton

18.0 kg / Carton

19 kg / Carton

 

Other Common Injection Packers Sizes:

     10*100mm, 10*150mm, 13*95mm, 13*110mm, 13*115mm, 13*120mm, 13*130mm, 13*160mm, 13*250mm, 13*350mm, 13*450mm, etc.

      

  Aluminium Mechanical Packers For Concrete Crack RepairAluminium Mechanical Packers For Concrete Crack Repair

Materials of Application

 

       Hydrophilic Polyurethane (WPU) and Hydrophobic Polyurethane (OPU) foam stop leakage agent, Epoxy Resin.

 

Application Field

 Subway Station, Tunnel, Culvert, Foundation Improvement, Soil Settlement, Reservoir, Port Project, Top Slab, Crack, Construction Join, Shrinkage Crack, Basement Hairline Crack, etc., water stop projects.

 

Notes during Applying

  1. Stop injecting if injected materials does not emit from the cracks after 5 minutes of application. Check for cross-drilled buried pipeline or other unnoticed holes.
  2. All application process should be closely watched. If the injection machine’s pressure remained high after releasing the valve on the connector, cracks and injection packers should be checked.

 

Packaging & Shipping

Transportation by Air: Arrival within 2-7 days upon receipt of payment, excluding weekends and holidays.

Transportation by Ship: Delivery within 2-5 days upon receipt of payment, excluding weekends and holidays.

Packing Detail: 40 cartons per pallet (1*1 M)

Our Services

1. 24hour online service.

2. Enquiry will be replied in 2 hours.

FAQ

Q: Would you afford samples to test by ourselves?

A: Of course we can, we will provide you free samples with freight charge, when you place an order, we will pay the freight charge back to you.

Q: Is samples as same as big order?

A: Keep same Quality as you saw always.

Q: What is your main Market?

A: Asia, Southeast Asia, Middle East, Oceanica.

Q: How can I get the after-service?

A:  The  service package will help, if it is man-made problems, we also send the spare parts, but you should pay.

 

Contact Supplier

Ms. Barbara Sheng Manager Chat Now
Telephone
86-21-63040008
Mobile
008615221025352
Fax
86-21-64033334
Address
RM 702,No.1189, WuzhongRD Shanghai

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Energy & Mineral Equipment > Oil Field Equipment > Packer
Categories
Hi~