Railway AAR Carbon Steel Wheel
USD $1,000 - $3,000 /Piece
Min.Order:1 Piece
Jiangsu Railteco Equipment Co., Ltd.
Package: four or five pcs in one bunch, packaged in Nylon Bag
or Wooden cases: export wooden cases with fumigation certifications
Delivery: within 45 days after order confirmed
Railteco Group(stock code:833120) was established in the year 2003, mainly engaged in design, manufacture and maintenance of railway wagons, vehicle parts, passenger coach interirors and railway equipment.
A: We are factory. We have production bases in Zhangjiagang, Changzhou, Suzhou and Anwei Tongling.
A: For first batch 30 to 45 days, series batch according to customer's plan.
A: Yes, we have design ability, and we have an expert technology team for railway equipment.
A: T/T or L/C, we need at least 30% deposit, and balance before shipping.
If you have another question, pls feel free to contact us as below: