double layer high speed colored roof steel sheet roll forming machine
USD $2,000 - $10,000 /Set
Min.Order:1 Set
Botou Jinbaili Roll Forming Machine Co., Ltd.
high speed colored roof steel sheet roll forming machine
Main technical parameter
1.manual decoiler: manual expanding, passive uncoil
Inner Diameter. Φ460-520mm
Outer Diameter. Φ1400mm
2.weight capacity of decoiler:5-8 T
3.machine stand: welded shape steel
4.type of forming machine : wallboard type with chain transmissionfloor deck
5.diameter of shaft: 80mm
6.material of shaft: 45 steel
7.chain:20A
8.motor power of forming machine:11KW*2
9.forming speed:10-13m/min
10. roll station:30 stations(according profile)
11. material of roller : 45 steel
12. surface of roller coated with chrome 0.05mm thickness
13. motor of hydraulic station:4KW
14. hydraulic oil pump: bear pump CB-E314
15. type of cutting: hydraulic cutting
16. material of cutting blade:Cr12
17. heat treatment of cutting blade:HRC58°-60°
18. thickness of steel coil:0.6-1.5mm
19. tolerance of length:10±2mm
20. transducer: Panasonic
21. computer adopts Panasonic PLC
22. computer operating board adopts Touch screen
23. Voltage: 380V 3 phase 50HZ or at buyer’s requirement
Technical process
Manual decoiled→ feed with guide→ roll forming→ cutting with fixed length→ output with table
Equipment
Manual decoiler, main forming machine, hydraulic cutting device, hydraulic station, PLC computer control, output table
The time of producing: 30days after deposit
Payment : T/T
First deposit T/T 30% when sign the contract, then 70% T/T before delivery
Warranty: 1 year and life-long maintainance
*Installation and debugging: We will send professional engineer to make installation and debugging, Buyer pay our engineer each one 50 USD/day, and provide accommodation, food and the round-trip ticket fee.
* Installation Days: about 5-7 days
Price item :
1)FOB Tianjin: 11500USD
2) Payment:50% T/T prepaid, and pay the balance before shipping.
3) Delivery time: 30 working days.
4) Guarantee period: 12 months limited warranty starting from date of delivery. Shipping cost for parts to be replaced during warranty period have to be borne by the customer.
5) Spare parts: bearings, buttons, chains, magnetic valve, protective tube etc.
6) Installation and training:
1.If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
2.Without visiting, we will send you user manual and CD to teach you to install and operate.
3. COST OF INSTALLATION:
The buyer should pay the installation charges (USD 80 one man one day). To the seller’s appointed account by T/T before the seller’s technicians go to the buyer’s factory. The buyer pays the seller’s technicians travel cost outside China, including round air tickets fee, accommodation and food, provide transportation from living hotel to the work place, necessary communication, and insurance, etc.
Machine picture for reference:
the other products are packaging in the container
other prodects what we can produce very well.
Service Promise:
A. We will arrange engineers to supervise installation and make adjustment for the equipment; Buyer should pay $50 for each engineer every day. The buyer should be responsible for transportation (including round-trip ticket), insurance, accommodation.
B. Guarantee period:
1. The warranty will be maintenance, maintain in the guarantee period of one year starting from delivery. Because of the quality of equipment during guarantee period, we will provide the parts free of charges, which is in the conditions of correct operation. (Natural disasters or factors which can’t forced by human are excluded).
2. If the equipment are out of work in the guarantee period, the buyer needs our repairman to come to buyer’s factory, the buyer should be responsible for the tickets(including round-trip ticket), the fee of transportation to the buyer’s factory and the fee of accommodation. Required to change spare parts, the buyer should afford the freight fee and we don’t ask extra fee.
C. Detail Engineering
1. Lay out and general arrangement drawing
2. Funation lay out drawing
3. Eration and maintenance instructions
D. Training
During installation and adjustment of the equipment, our engineers shall provide the training to buyer’s personnel to operate and maintain the equipment. Additional trading can be provided on request.
1. Foundation construction, electrical works, and civil engineering;
2. Electrical wire, mechanical tubes, water tubes between machines;
3. Lubricating oil, recirculation oil, gear box oil, recirculation cooling water;
4. Safety equipments and non-standard safety items;
5. Testing material;
6. Engineering service required at the buyer’s site.