Brand | TIMKEN NTN KOYO |
Model | Forklift Bearing |
Cage material | Iron ,brass, nylon |
Precision | P5,P4 |
Sealing | C3,C4 |
Quality standard | ISO9001:2000 standard |
Service | OEM service |
Delivery date | Normally ready goods and stock |
Payment terms | A:100% L/C at sight B:30% T/T in advance .70% against copy of B/L C:Western Union D:Paypal |
Application | Auto, tractor ,machine tool, electric machine, water pump,forklift, agricultural machinery and textile machinery |
Package | 1.Industrial packing:Plastic tubes/Outer cartons/Pallets 2.Single box packing:Single box/Outer cartons/Pallets 3.According to your request |
Infomration for using forklift bearings
First, clean forklift bearing and its surroundings
Even invisible dust into forklift bearing a smile, will increase wear, vibration and noise of the bearing.
Second, be careful when installation
Don't allow a strong punch, does not allow a direct hit with a hammer forklift bearings, don't allowed to pass through the rolling pressure.
Third, the use of appropriate, accurate installation tool
Try to use a special tool, try to avoid using fabric and staple fiber stuff like that.
Fourth, to prevent corrosion of bearings forklift
Bare hands when handling forklift bearings, to fully wash hands sweat, and coated with high-quality mineral oil before operation, during the rainy season and summer with particular attention to rust.
However, in certain special operating conditions, forklift bearings can get a longer life in traditional computing, especially in light load conditions. These special operating conditions is that, when the rolling surface (track and rolling pieces) is effectively separated and limit pollutants may cause damage to the surface of a lubricant film.
Model | Size | Model | Model |
980811 | 55/121.3/34 | 780306K | 84904 |
980811NT | 55/119.2/34 | 780307K | 84905 |
80511Y | 55/121/34 | 780308K | C2-3 |
80511K | 55/120/34 | 780309K | C4-5 |
80511K2T | 55/120/34 | 780310K | C6-10 |
80711K | 55/110/31.5 | 780408K | CN-2 |
80711Y | 55/112-110/31.5 | 780506K | CN-3 |
10811S/M | 55/118.5/34 | 780708K/H | CN-4 |
80611K5T | 55/149/45-33 | 780709K | CN-8 |
30311 | 55/151/45-33 | 782311 | CN-9 |
10311T | 55/151./45-28 | 780711K | CN-10 |
630811 | 55/112/30 | A60309 | CN-12 |
730811 | 55/120.5/35 | 780411 | CN-13 |
30411 | 55/161/42 | 782415H | CN-14 |
J30211 | 55/112/34 | 172711 | CN-15 |
T20211 | 55/112/34-21 | T60211 | CN-16 |
J50211 | 55/123/40 | 33007031 | CN-17 |
760211AET | 55/112/35 Y | 34007031 | CN-18 |
CG92310T | 50/123/34 | 32507031 | CN-19 |
10310RT | 50/123/40 | 92507511 | |
30312 | 60/179/49-31 | 51507031 | |
30313 | 55/121/34 | 33015022 | other |
10313T | 65/183.5/45 | 722715 | 198908 |
780710 | 50/143/41 | 172715 | 25TAG12 |
10220D | 100/205/52 | 32TAG12 | |
30322 | 110/210/50 | BEARING | 28TAG12 |
10724 | 120/245/66-46 | 30214 | 30TAG001 |
51507007 | 30/78/28 | 30211 | 40TAG12 |
92507007 | 40/109/30 | 30206 | |
93007007 | 40/107/30 | 30207 | |
94007007 | 40/123/32 | 30208 | |
180705K | 25/80/22 | 32208 | |
180706K | 30/91.5/24 | 32207 | 943/32 |
180707K | 35/102/25- | 32211 | BM283930 |
180708K | 40/109.7/32-23 | 32209 | HKS283533 |
180709K | 45/119/29 | 30306D | HKS303730 |
80605K | 25/70/17 | 30216 | HKS283530 |
80607K | 35/102/25.4 | CR1252 | FLA-283525 |
5208 | 40/90/29 | 32210 | HKS-323934 |
180704K | 20/65/20 | 30213 | HMK2830 |
20311 | 55/151/45 | HK3026 | |
180705D1 | 25/78/23 Y | F-4026 | |
RJN50251 | 28/80/24 | ||
MG207FFU | 92 x 35 x 31 | ||
MG207FFQJ | 111 x 35 x 30 | ||
MG209DD | 101 x 45 x 28 | ||
Y30208 | 40/112.3/29-18 | ||
Y20208 | 40/110/29-18 |
Customer Service:
Any questions to be sent will get response within 30 minutes .
Lead Time:
Sample Lead-times: generally 1-3 workdays.
Production Lead-times: 20-30 workdays after getting your deposit.
Transit Time:
For small weight or Urgent, goods will be sent by Express DHL/FedEX/UPS/TNT/EMS
For max production, goods will be shipped by sea/by air.
According to client’s requirements.
After-sales service:
Before shipment ,products will be strictly inspection on our factory ISO9001:2008 Process System.
Just in case, there is abnormal. Please contact us at first time, Customer Complaint handling procedure will be boot at once.
Implementation of the scheme will be come out within 48 hours.
We will negotiate with customer to find a reasonable way to resolve and compensate.