anodized aluminium tube,aluminium 6061 t6 tube,aluminium tube
USD $2.52 - $2.55 /Kilogram
Min.Order:300 Kilograms
Guangdong Kingstars Industrial Co., Ltd.
Aluminum extrusion tubes, pipes
Material : Aluminium alloy 6060,6061,6063,2024,5052,7005,7075 T5/T6
Process: Extrusion, Forging. Turning, Drilling .threading, CNC machining, etc.
Finish: Sand blasting. Polishing, Powder-coating .Anodizing .Painting . Plating.
Color: Any color is available.
Product using .
Decorations,
Building or industrial materials,
Construction,
Section, etc.
Specification
1. Aluminium extrusion pipes, tubes
2.Alloy:6060,6061,6063,6082,2024,5083,7075,7005, T5/T6
3.Diameter:5-350 mm
4.wall thickness:0.3-20mm
5.Temper: T3- T8
6. Process of cold drawn is available.
7. seamless or seam tube and pipe
Aluminum | Alloy 6060-T5/T6, 6063-T5,6061-T6, 2024,7005, 7075, etc. We will never use aluminum scraps. |
Surface treatment | Polishing, anodized or powder coating, etc. |
Color | Any color is available. |
Film standard | Anodized:7-23 μ , Powder coating: 60-120 μ , Electrophoresis film: 12-25 μ |
Life | 10-20 years out door. |
MOQ | 300kgs |
Length | Within 6M long |
Thickness | 0.3mm-20mm or Customized. |
Applicance | Building or industrial materials, construction, decoration, etc. |
Equipment | 600-5000 tons all together 9 extrusion lines. |
Capacity | output 150 tons per day. |
Equipment | Aluminum extruion machine sets Aluminum extrusion machine—5000 T /set Aluminum extrusion machine—3500 T /set Aluminum extrusion machine—2500 T /set Aluminum extrusion machine—1650 T /set Aluminum extrusion machine—1000 T /2 sets Aluminum extrusion machine—600 T /3 sets
Processing main equipment: CNC machine center —1 set CNC machine 1890 --1 set CNC machine 850 -- 3 sets CNC machine 650 --3 sets Forging machine --5 sets Lathe --5 sets Automatic cutting machine --2 sets Anodized line --2 sets Powder coating line --1 set Polishing -- 8 sets |
Mould |
7-10 days
|
Free samples | Samples are free for new mould approval. |
Packing | Bubble bags+cartons+pallets |
Delivery | By express delivery, by air or sea. |
Fabrication | Die designing→Die making→Smelting&alloying→QC →Extruding→Cutting→Heat Treatment→QC→Surface treatment→QC→Welding→Packing→QC→Shipping→After Sale Service |
Processing | CNC machine center machining/Cutting/Punching/Checking/Tapping/Drilling/Milling/lathe |
Certificate | 1) ISO9001-2008/ISO 9001:2008; 2) GB/T28001-2001(including all the standard of OHSAS18001:1999)
|
Payment | 1. T/T: 30% as deposite, balance will be payed against shipping document; 2. L/C: the balance irrevocable L/C at sight. |
Leat time | 15 days for production. 2. If opening mould, plus 7~10 days; |
Port
| Guangzhou,Shenzhen, Hongkong. |
OEM | Welcomed! |