Crawler core drilling rig
USD $29,500 - $50,000 /Set
Min.Order:1 Set
Shandong Binzhou Forging And Pressing Machinery Factory
DESCRIPTION:
Featured:
-It select 53×59 six-party main rod, it has good rigidity, and has large torque.
-BZTX300L core drilling rig using patented technology taper clutch, it has large transfer torque, easy operation, no maintenance and the others prominent features.
-The windlass planetary gear increase modulus and install bracket, it improve the lifting and braking capacity greatly.
-The scroll box has 4 sets bearing to locate, it can make sure gyrator has enough rigid to respond the graver layer, cobblestone layer and the others complex geological conditions.
-Compare to the similar products throughout China, we install the 160l/min mud pump first, with a costing savings, compact and easy to move.
Adaptation:
Geological prospecting and exploration, basic exploration for roads and high-rise buildings, and several inspection hole concrete structure, dams, roadbed grouting hole drilling and grouting directly, water well and geothermal central air conditioning.
Drilling depth | m | 100 | 250 | 300 | 600 |
Drilling DI | mm | 300 | 200 | 150 | 75 |
Open hole DI | mm | 300 | |||
End hole DI | mm | 75 | |||
Drilling rod | mm | Φ60 | |||
Drilling angle |
| 90°-65° | |||
Rotary Spindle | |||||
Spindle forward speed | r/min | 30-1050 | |||
Spindle reverse speed | r/min | 29-137 | |||
Spindle stroke | mm | 560 | |||
Spindle inner diameter | mm | 96 | |||
Spindle lifting capacity | KN | 60 | |||
Main Winch ( drive hydraulic system) | |||||
Single line lifting speed | m/min | 0-45 | |||
Hug floodgate belt width | mm | 90 | |||
Tightrope diameter | mm | 14 | |||
Hoist single line lifting capacity | KN | 40 | |||
Roller diameter | mm | 200 | |||
Roller cubic measure | m | 30 | |||
Minor Winch ( drive hydraulic system) | |||||
Roller diameter | mm | 140 | |||
Wire rope diameter | mm | 6 | |||
Capacity roller | m | 450 | |||
Mud pump | |||||
Horizontal Triplex BW-250 mud pump | |||||
Displacement | L/min | 250 | |||
Work pressure | Mpa | 7 | |||
Water inlet caliber | mm | 75 | |||
Water to exit caliber | mm | 50 | |||
Gear Oil pump | |||||
Duplex gear oil pump CBF-F63/25 | |||||
Front displacement,pressure | 63mL/r 20Mpa | ||||
Behind displacement,pressure | 25mL/r 20Mpa | ||||
Drilling rig Power | |||||
Diesel engine | Hp | R4105ZD 76HP | |||
Electric motor | KW | Y180L-4 22KW | |||
Crawler chassis | |||||
moving speed | 2Km/H | ||||
motor work pressure | 20Mpa | ||||
Displacement | 1634ml/rev | ||||
chassis loading | 3T | ||||
crawler chassis length | 2.6m | ||||
motor oil displacement | 50L/min | ||||
crawler chassis width | 0.35m | ||||
Max high crawler | 0.508m |