Hot sell Triple Layer Cable Wire Mica Taping Machine for Cable shielding
USD $6,000 - $8,900 /Set
Min.Order:1 Set
Jiangsu Jiacheng Technology Co., Ltd.
630Double layer Aluminum Foil Tape Wrapping & Taping Machine
JCJX-500 Flame-retardant Wire Cable Taping or Wrapping Machine
Single or Double-decked Electric Vertical Cable Taping Machine
JCJX-630 Aluminum Foil Tapping Or Wrapping Machine For Shielding Cable
JCJX-630 Electric Wire Aluminum Foil Taping Machine For Cable
JCJX- Hot Sell Triple Layer Cable Wire Mica Taping Machine
1, Our product
2,Main Specification
1. Lay range 10mm-50mm
2. Overlap 20%-50%
3. Line speed 35m/min max.
4. Speed of taping head: 2500rpm
5. Detail of motor: capstan 2HP, take-up 5HP, three taping head 3HP(each 1HP), motor and drive to be Siemens as your requirements.
6. Take-up bobbin din: active power take- up, flange 560 mm, traverse 335 mm,bore 127 mm, overall Width 375 mm, barrel Dia. 280 mm
7. Pay-off : single head tension type, bobbin din 560/630mm.
8. No. Of taping heads: 3
9.In the control panel:digital length counter preset, rpm meter and hour meter to be provided
10. Safe guards also to be provided
11. Detectors of tape brake to be provided
12. Drain wire bobbin din 200mm
13. Core gide paths to be provided with India anodic treatment rollers so that core movement
in the machine should not get damaged.
14. Tape pad size dia. 300mm,ID 75mm
15. Traverse plain shaft dia. 30mm
16. Lay changing: equip 3 sets stepless speed variator for 3 taping head, lay can be changed
through different speed.
17. Overlap is decided by the lay you set.
18. Tape tension: each tape head equiped with one electromagnetic powder tension linear track
2-1 usage
copper wire or cable surface's taping, for example: copper tape, mica tape, aluminum foil, polyester tape, transparent tape, mylar tape and non-woven, etc.
3,our cetificate
4, our office ,factory and our team
we have 9 stroies building offive and mutilpul workshops and eight morden manufaturing plant.
5. After-sell service
5-1. Pre-sale training:
In order to guarantee the customers are able fully to operate the machine, if the customer need, we can help customer training, includes:
(1) Correct operating mode
(2) Correct maintenance way
(3) Remove simple proble
52. Guarantees
Since the shipment date, 12 month for mechanical part, and 6 month for electrical parts