New condition automatic Bondeck making machine
New condition automatic Bondeck making machine
New condition automatic Bondeck making machine
New condition automatic Bondeck making machine
New condition automatic Bondeck making machine
New condition automatic Bondeck making machine

New condition automatic Bondeck making machine

USD $30,000 - $50,000 /Set

Min.Order:1 Set

Supply Ability:
30 Set / Sets per Month
Port:
Tianjin
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Condition:
New
Type:
Cold Rolling Mill
Place of Origin:
Hebei, China
Brand Name:
TG
Model Number:
TG- floor
Voltage:
380V

Hebei Taigong Roll Forming Machinery Co., Ltd.

Business Type: Manufacturer,Trading Company
Cangzhou Hebei China
Main Products: roof and wall roll forming machine ,highway guardrail roll forming machine ,C/Z/U/W purlin machine ,Door frame roll forming machine ,sandwich panel roll forming machine

Product Details

Equipment Description

 

1.  Equipment technical specification

 

Description

Product Name

Floor Deck Roll Forming Machine

Machine Size

11100*1550*1650mm

Machine Weight

About 12 T

Frame Materials

350H steel

Middle plate thickness

20mm

Forming Shaft

Diameter

100mm

Material

40r qModulation processing

Forming roller

Cr12 Valcum quenching process

Drive mode

2 inch sprocket, chain

Main Engine power

22 KW with cycloidal reducer

Pump Station Motor

5.5KW

Forming Rows

26 rows

Forming Speed

15-20m/min

Pressing Thickness

0.2-0.7mm

Pressing width

1500mm

Automatic Control

Yes

Computer

SIEMENS

Coder

 Wuxi "rip" or "Xin Ya"

Switch

" CHINT "or" delixi"

 

 Equipment for Reference:

 New condition automatic Bondeck making machineNew condition automatic Bondeck making machineNew condition automatic Bondeck making machine

 New condition automatic Bondeck making machine

 

2. More details

 

(1) Hydraulic Ue-coiler

 

Un-power: manual de-coiler; Max. Capacity: 7T

 

Suit for coil inner diameter: 508mm, suitable coil Max. out diameter: 1000mm

 

Manual power expands the coil inner surface.

 

(2) Hydraulic Cutting

 

1) Adopts post cutting, Stop to cut;

 

2) The cutting blade material is Cr12 with quenched treatment.

3) Adopts welded frame for good rigidity.

 

4) Cutting frame has been heat treatment to avoid final product deformation. cutting length tolerance ±2mm.

 

5) The power of cutting is provided by hydraulic station.

 

6) The final product can be cut as per set length in PLC controller, and the length is automatically measured by encoder. When final product reaches the set length, machine will stop to cut the Product automatically. Finish this action, machine will run again continuously.

(3) Hydraulic station

 1) It supplies the power for the hydraulic cutter.

 2) All hydraulic accessories are all use Chinese famous brand products.

 4)      Hydraulic motor power: 3KW

 

 

(4) PLC Control System

 1) This system uses Delta PLC to control the all working actions. Production quantity and each piece length will be automatically measured. It is convenient to control the roll forming machine.

 2) Delta converter adjusts speed technology, realize the automatic production.

 3) Text screen is input and cancelled the working data.

 4) Friendly man-machine interface system can be set batches to the work piece, length, quantity, etc.

 5) Encoder count, having function of count and measuring length.

 6) Suitable power voltage: 380V/50HZ/3Phase (can de designed according to buyer’s requirement)

New condition automatic Bondeck making machine

3. Company Information:

New condition automatic Bondeck making machine

 

New condition automatic Bondeck making machine

New condition automatic Bondeck making machine

New condition automatic Bondeck making machine

New condition automatic Bondeck making machineNew condition automatic Bondeck making machine

New condition automatic Bondeck making machine

New condition automatic Bondeck making machineNew condition automatic Bondeck making machine

New condition automatic Bondeck making machine

4. Payment terms and after-sale service:

 

1) FOB Tianjin

 

2) Payment: 30% T/T deposit, and pay the balance before shipping.

 

3) Delivery time: 30 working days.

 

4) Guarantee period: 12 months limited warranty starting from date of delivery. Shipping cost for parts to be replaced during warranty period have to be borne by the customer.

 

5) Spare parts: bearings, buttons, chains, magnetic valve, protective tube etc.

 

6) Installation and training:

 

1. If buyers visit our factory and check the machine, we will teach you how to install and us the machine, and also train your workers/technician face to face.

 

2. Without visiting, we will send you user manual and CD to teach you to install and operate.

 

3. COST OF INSTALLATION:

 

The buyer should pay the installation charges (USD 120 one man one day). To the seller’s appointed account by T/T before the seller’s technicians go to the buyer’s factory. The buyer pays the seller’s technicians travel cost outside China, including round air tickets fee, accommodation and food, provide transportation from living hotel to the work place, necessary communication, and insurance, etc.

If you have any further question of our Equipment, please feel free to contact me, thanks!

Contact Supplier

Ms. Elva Zhang Chat Now
Telephone
86-317-8179009
Fax
86-317-8179009
Address
Industry Development Zone 137 Hebei

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Metal & Metallurgy Machinery > Rolling Mill
Categories
Hi~