STS-030 30kg tension load cell for measurement
Negotiable /Unit
Min.Order:1 Unit
Wuhan True Engin Technology Development Co., Ltd.
STS-030 30kg tension load cell for measurement
1.This sensor is same as LX-030TD and LX-050TD in size and installation so that it can replace the tension sensor which made by Mitsubishi(modes above mentioned)
2.STS series adopt differential transformation instructure,good stablility and linear structure .It is small in size and light weight high speed and accuracy .It can be used in measure weight and force .It is the good detection choice of packaging and printing industry.
STS tension sensor technique parameters
specifications | STS-010 | STS-020 | STS-030 | STS-050 | STS-100 | STS-200 | STS-300 |
rated load | 10 KgF | 20 KgF | 30 KgF | 50 KgF | 100 KgF | 200 KgF | 300 KgF |
load direction | press or traction | ||||||
installation | pedestal tape ,suspended type,side type | ||||||
connect cable | 4 cores shielding cable(3-6m) | ||||||
working supply | 5V/20mA | ||||||
working environment | 0-40℃ | ||||||
size | 134mm*48mm*78mm | 150mm*68mm*78mm | |||||
weight | 1.8Kg | 2.5Kg |
EFFECT PICTURE
APPLICATIONS
Wuhan University of Technology
WUT was merged on May 27th 2000, from the former Wuhan University of Technology (established in 1948), Wuhan Transportation University (established in 1946) and Wuhan Automotive Polytechnic University (established in 1958). WUT is one of the leading Chinese universities under the direct administration of the Ministry of Education and one of the universities constructed in priority by the “State 211 Project” for Chinese higher education institutions; its Material Science and Engineering entered the “State 985 Project” for world excellent disciplines. WUT ranked 49 according to Times Higher Education Asia University Rankings 2014 Top 100 and ranked 351-400 according to Times Higher Education World University Rankings 2014-2015.
1. When can I get the quotation?
Within 24 hours after inquiry. If you are urgent to get the price, please call us so that we can regard your inquiry priority.
2. How should I place the order?
Please let us know the model number based on specs for powder cluth, powder brake, air bluth, air brake, electromagenetic cluth, electromagnetic brake and safety chuks. For air shaft and roller, please show us your drawing or let us know your requests, and then we will provide you drawing for confirmation.
3. What's your MOQ?
We don't have moq request, except the rollers.
4. What about the lead time for production?
That depends on quantity and type of products.
Usually 3-5 days for powder cluth / brake, tension controller.
15-25 days for safety chuks, air shaft and roller.
5. What's the term of delivery?
Incoterms as EXW, FOB, CIF etc, you can choose the most convenient way.
6. Is it safe to do business with you?
We have joined Ali Trade Assurance, which is guaranteed, you are safe doing business with us.
If any questions, you are highly welcomed to contact with us any time!
Online skype kay8611 can reach us.