synchronous motor linear actuator easy installed
Negotiable /Unit
Min.Order:1 Unit
Wuhan True Engin Technology Development Co., Ltd.
synchronous motor linear actuator easy installed
1,pedestal construction 15°rotate in vertical direction
2,accurate ball screw rod
3,limit switches/middle switches
4,working voltageAc220V
5,synchronous motor90TDY(110TDY)
6,driver distance80-150mm
7,maximum thrust150Kg
8,driver speed10mm/sec
9,can be cooperated with EPC-100
TECHNICAL PARAMETERS
model | size | weight | accuracy | response time | Deviation speed | ||||
H | H1 | L | L1 | L2 | |||||
EPD-101 | 95 | 43 | 328±70 | 95 | 100 | 800Kg | ±0.2mm | 15ms | 0-10mm/S |
EPD-102 | 106 | 60 | 328±70 | 110 | 117 | 1500Kg | ±0.2mm | 15ms | 0-10mm/S |
EPD-103 | 135 | 73 | 328±70 | 150 | 137 | 2500Kg | ±0.2mm | 15ms | 0-10mm/S |
EFFECT PICTURES
Wuhan University of Technology
WUT was merged on May 27th 2000, from the former Wuhan University of Technology (established in 1948), Wuhan Transportation University (established in 1946) and Wuhan Automotive Polytechnic University (established in 1958). WUT is one of the leading Chinese universities under the direct administration of the Ministry of Education and one of the universities constructed in priority by the “State 211 Project” for Chinese higher education institutions; its Material Science and Engineering entered the “State 985 Project” for world excellent disciplines. WUT ranked 49 according to Times Higher Education Asia University Rankings 2014 Top 100 and ranked 351-400 according to Times Higher Education World University Rankings 2014-2015.
1. When can I get the quotation?
Within 24 hours after inquiry. If you are urgent to get the price, please call us so that we can regard your inquiry priority.
2. How should I place the order?
Please let us know the model number based on specs for powder cluth, powder brake, air bluth, air brake, electromagenetic cluth, electromagnetic brake and safety chuks. For air shaft and roller, please show us your drawing or let us know your requests, and then we will provide you drawing for confirmation.
3. What's your MOQ?
We don't have moq request, except the rollers.
4. What about the lead time for production?
That depends on quantity and type of products.
Usually 3-5 days for powder cluth / brake, tension controller.
15-25 days for safety chuks, air shaft and roller.
5. What's the term of delivery?
Incoterms as EXW, FOB, CIF etc, you can choose the most convenient way.
6. Is it safe to do business with you?
We have joined Ali Trade Assurance, which is guaranteed, you are safe doing business with us.
If any questions, you are highly welcomed to contact with us any time!
Online skype kay8611 can also reach us