SELON SE-GSD150 DRUG STABILITY TEST CASE, LARGE PROCESS CONTROL, ONLINE DATA ACQUISITION
USD $5,343 - $6,107 /Set
Min.Order:1 Set
Shanghai Selon Scientific Instrument Co., Ltd.
SELON SE-GSD150 DRUG STABILITY TEST CASE, LARGE PROCESS CONTROL, ONLINE DATA ACQUISITION
stability testing
test chamber
lab instruments
| SE-GSD150 |
Inner size | 600*405*620 |
Temperature range | no illumination0~65°C
|
Temperature control fluctuations | ±0.5°C |
Control windage | ±2°C |
Humidity control range | 30~95%RH |
Humidity deviation |
±3%RH |
Illumination range
|
0~6000 LUX |
Illumination windage |
±500LUX |
Regulating mode | Balance temperature and humidity regulation mode |
Refrigeration system | Closed compressor independent control(DANFOSS)
|
Humidity transducer | Imported capacitive moisture sensor(ROTRONIC) |
Temperature transducer | Pt100 Platinum resistor |
Recorder | Imported recorder with paper(optional) |
Experimental unit | 40°C 75%RH,25°C 60%RH |
Work environment temperature | +5~35°C |
Electrical source | AC 220V±10% 50HZ |
Safety device | Compressor overheat, fan overheating, overheat, compressor over press, overload, water protections |
Shelf | 2 pcs |
SELON SE-GSD150 Drug Stability Test Case, Large process control , online data acquisition
stability testing, test chamber, lab instruments
FEATURES:
The new generation of drug stability test case, assemble years experience of design and production, and introduce into German technology, breach the defect of existing cast which can not endure long time and continuous operation. It adopting advanced technology of adjusting-illumination(HEP light-regulator from GERMANY), main imported parts performance is stable and reliable.
1,Imported closed compressor, use R134a environmental protection refrigerants, low noise, high efficiency, long service life
2,Imported touch screen controller, large process control, a precise and reliable control, with R232 interface
3,Data record, online data acquisition, imported recorder with paper, two data recording mode selection
Payment Terms
1. All the payments required before
2.30% deposit required before production, 70% balance before delivery.