China manufacturer carbon steel DTII, TD75 belt conveyor idler roller
USD $295.36 - $2,195.26 /Piece
Min.Order:50 Pieces
Hebei Lanjian Rubber Belts Co., Ltd.
China industrial carbon steel small conveyor belt guide roller
China suppliers Rubber coated steel impact conveyor drive roller
Hebei lanjian manufacture rubber coated conveyor tensioner pulley
Hebei lanjian menufacture conveyor drive roller, conveyor belt roller
material handling equipment competitive price rubber coated impact trough roller
China manufacturer carbon steel DTII, TD75 belt conveyor idler roller
China mufacturer carbon steel DTII, TD75 belt conveyor idler roller
Certification:ISO,
Type conveyor: DTII, TD75
Bearing NO: 1310,1312,1314,1316,3520,3524,3532
Material: carbon steel, Rubber
Pulley dia: from 250mm to 2400mm
1.Steady running, reliable quality and reduce maintenance;
2.Less movement longitudinally, rotating smoothly, extends the life span;
3.Various bearing housing and sealing structure are available for the customers choice;
4. Multipass labyrinthine sealing,preventing the mixed dirt and water immersed;
5.Manufacturing by steel pipe specially for of high precision roller, ensuring the strong load,
low shaking and less noise.
China mufacturer carbon steel DTII, TD75 belt conveyor idler roller
Parameter of conveyor idler | |||
Type | Belt widt | Standard diameter | Length |
(mm) | (mm) | (mm) | |
Driving pulley, | 500 | 500 | Length of pulley depends on the width of conveyor belt |
bend pulley | 650 | 500~630 | |
800 | 630~1000 | ||
1000 | 800~1150 | ||
1200 | 800~1150 | ||
1400 | 1000~1350 | ||
1600 | 1150~1600 | ||
1800 | 1150~1800 | ||
2000 | 1350~2000 | ||
2200 | 1600~2200 | ||
2400 | 1800~2400 |
China mufacturer carbon steel DTII, TD75 belt conveyor idler roller
China mufacturer carbon steel DTII, TD75 belt conveyor idler roller
China mufacturer carbon steel DTII, TD75 belt conveyor idler roller
1. By Sea for batch goods
2. Loading port: Tianjin, Shanghai or according to customer's requirement
3. Delivery Time: 3 -7 days for samples
15-25 days for 1-2 20ft containers
20-30 days for 3-4 20ft containers