alibaba china power transformer 10kv Dry-type power transformer 250Kva
USD $3,500 - $17,000 /Set
Min.Order:1 Set
Chengdu City Wenjiang District Cole Electric Manufacturing Factory
Cole Electric Manufacturing Factory
duct advantages
transformer power transformer oil immersed transformer electric transformer
1.Safe, hardly inflammable, no pollution.
2.Lowloss.low noise.high reliablity.
3.Highly moisture-proof ability.
4.Good fire prevention and isolation performance.
5.Maintenance free.
6.High heat resistance.Moisture resistance.
2.SC(B)10 - M series power transformer technical parameters
Model | Capacity | Vector Group | Valtage combination(KV) | No-load loss | Load loss | No-load current | Short circuit resistance | ||
KVA | HV(KV) | HV Tap range(%) | LV(KV) | W | W | % | % | ||
SC10-30 | 30 |
Yyn0 / Dynll |
10 6.3 6 |
±2*2.5% / +3 *2.5% -1 |
0.4 | 190 | 740 | 2.3 |
4.0 |
SC10-50 | 50 | 270 | 1060 | 2.2 | |||||
SC10-80 | 80 | 370 | 1470 | 1.7 | |||||
SC10-100 | 100 | 400 | 1690 | 1.7 | |||||
SC10-125 | 125 | 470 | 1980 | 1.5 | |||||
SC10-160 | 160 | 540 | 2320 | 1.5 | |||||
SC10-200 | 200 | 620 | 2690 | 1.3 | |||||
SC10-250 | 250 | 720 | 3070 | 1.3 | |||||
SC10-315 | 315 | 880 | 3690 | 1.1 | |||||
SC10-400 | 400 | 970 | 4350 | 1.1 | |||||
SC10-500 | 500 | 1160 | 4900 | 1.1 | |||||
SC10-630 | 630 | 1300 | 5960 | 0.9 | |||||
SC10-800 | 800 | 1520 | 6960 | 0.9 |
6.0 | ||||
SC10-1000 | 1000 | 1770 | 8130 | 0.7 | |||||
SC10-1250 | 1250 | 2090 | 9690 | 0.7 | |||||
SC10-1600 | 1600 | 2450 | 11730 | 0.65 | |||||
SC10-2000 | 2000 | 3050 | 1450 | 0.65 | |||||
SC10-2500 | 2500 | 4000 | 17200 | 0.55 |
3.Product Dimension
4.Product Details
Mian Product
More Products To Choose
Brief Introduction
Cole Electric Manufacturing Factory Located in the chengdu cross-strait science and technology industrial development park,Sichuang Province ,With its inception in 2003,Company is mainly specialized in design, development, production, sales below 35 kv level combined transformer, 10 kv power transformer, outdoor vacuum switch and the combined substation as one camp in the name of the company.
Our Factory
We'll be always online and answer for your any question the first time.
FAQ For You
1.Q:What is your payment term?
2.A:What is your delivery time ?