Taizhou OEM factory High Qulity Automobile Head Light Plastic Mould Supplier,Injection Automobile Tail Lamp Molding manufacturer
USD $1,000 - $50,000 /Set
Min.Order:1 Set
Taizhou Huangyan Jingyuan Plastic Mould Factory
Taizhou OEM factory High Qulity Automobile Head Light Plastic Mould Supplier,Injection Automobile Tail Lamp Molding manufacturer
Mould Show
1.Description
Product Name | Taizhou OEM factory High Qulity Automobile Head Light Plastic Mould Supplier,Injection Automobile Tail Lamp Molding manufacturer |
Core &Cavity Steel | P20,718H,2738H, H13, NAK80,2316 etc. |
Mould base & Standard Component | DME,HASCO,Self-made etc. |
Steel hardness: | HRC35-38 |
Plastic material | PP,PC,PE,ABS,PVC etc. |
Cavity Number | Single,or by your request |
Injection System | Side Gate,pin-point gate...etc. |
Ejector System | Ejector Pin,Oil Cylinder |
Cycle Time | 30-60S |
Tooling lead time | 45-60 Days |
Mould life | 500,000 Shots |
Quality assurance | ISO9001 |
Our Advantage | 1.High quality |
2.Reasonable price | |
3.On time delivery | |
4.Good After-sale service | |
5.Strict quality control | |
6.All the mould are automotic | |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs | |
In-time communication on the technical points | |
In-time sending pictures for the mould machining progress and mould finishing schedule | |
In-time mould test and sample delivery | |
In-time mould delivery. | |
For more information please contact us. |
We specialized in manufacturing plastic injection mould for nearly 10 years .
1.Providing plastic mould for various parts according to your requirements.
2.We own the CNC processing centers and various advanced mould tooling machine.
3.Our products possess the advantages of high precision long life and short cycle with reasonable price,prompt delivery.
4.Mould design is subject to customers’ requirements.
5.Heat treatment of mold can be provided including quencher,nitridation,tempering,etc.
6.Our tenet is to manufacture customized and qualified mold as per requirement.
Main Technique Parameters | |
Cavity/Core Material | 718H, P20, 2738H,NAK80, 2316 |
Product Material | ABS, PC, PP, PVC, POM, PMMA, PS, PE, PET, Rubber, Silicone, PA, PBT, PEI, etc. |
Base | LKM or by requested |
Structure | Double color injection mould, Solid Mould, Insert Mould, Mould with Slide, Mould with Lifter |
Runner System | Hot runner, Cold runner |
Cavity | Single cavity, multi cavity by requested |
Finish | Corrosion word, Mirror finish, Brushed |
Longevity | 500,000SHOTS |
Mould standard | HASCO, DME, MISUMI, or by requested etc. |
Software | CAD, Pro-E, UG, etc |
Tolerance | ± 0.02mm |
Design Time | 3-7days |
Sample time | 3-7days |
Main Technique | Milling, Grinding, EDM, Wire-cutting, Engraving, CNC, and 2.5 Dimension test, etc. |
Production time | 2-7 weeks, depends on mould structure |
Packing | Wooden case, PE, or by request |
2. Mould Picture
Factory Show
1.Factory Tour
2.Processing Equipment
CNC machine | 5sets |
EDM | 6sets |
Wire cutting machine | 4sets |
Drilling machine | 4sets |
CNC Carving machine | 5sets |
Grinding machine | 1sets |
3.Custom Your Own Auto Parts Mould
1. Inquiry | Customer sends us sample or drawings | |
↓ | ||
3. Place an order | Customer confirms the steel, machine spec, plastic material. delivery time, payment item,special requirement ect. | |
↓ | ||
4. Mould Design | on the basis of confirmed order | |
↓ | ||
5. Mold Tooling | start after mold design confirmed, Cut steel, CNC machining, polishing, sampling | |
↓ | ||
6. Mold Process | Mould process photos update to customers each week | |
↓ | ||
7. Sample shoot | T0 - T1: Checking if mould running corrects, the dimension, weight, wall thickness meet customer’s request, if all ok, arrange samples for your approval. | |
↓ | ||
8. Delivery time | Once sample approved, ship the moulds in 7 days | |
↓ | ||
9. Shipping | By Sea: Nearest port-Ningbo/Shanghai | By air: Nearest airport-Shanghai/Hangzhou |
l Why choice US?
1.JY Mould advise suitable steel to meet your output production demand |
2. High speed performance |
3. Air venting solution in the container's handle area |
4. Prompt reply Plus professional communication |
5. Strict quality control |
6. On time delivery |
7. Good After-sale service Two-year after-sale technique support (2 Scheme) |