Sinolift Good Price CE Hand Pallet Truck

Sinolift Good Price CE Hand Pallet Truck

USD $100 - $200 /Unit

Min.Order:6 Units

Supply Ability:
1000 Unit / Units per Month
Port:
Shanghai Hand Pallet truck
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Place of Origin:
Shanghai, China
Brand Name:
Sinolift Good Price CE Hand Pallet Truck
Model Number:
Sinolift Good Price CE Hand Pallet Truck
After-sales Service Provided:
Engineers available to service machinery overseas

Shanghai Sinolift Equipment Co., Ltd.

Business Type: Manufacturer,Trading Company
Shanghai China
Main Products: forklift ,electric stacker ,scissors aerial workplatform ,hand pallet truck ,hydraulic hand drum truck

Product Details

Sinolift Good Price CE Hand Pallet Truck 

1)Features  Hand Pallet Truck

Simple and Easy Operation 

Lifting movement via collapsible foot pedal or 3 function handle control.

Sensitive lowering through sinking valve 

Hand push drive 

Overload protection via pressure valve

Safe Operation and secure Working Conditions

Stable chassis with 2 or 4 frame rollers and 2 steering rollers.

Long Service Lift.

Robust construction.

Hard chromium plated frame.

Hardened chromium plated ram.

Effortless Movement.

Ball bearing non-marring rollers.

Polyurethane rollers.

Tapered forks

 

2)Specifications  Hand Pallet Truck

Load Capacity  (Q):3300lb/4400lb/5500lb

(1500kg/2000kg/2500kg)
Standard Widths Across Forks (b5): 20.5/ 21.3/ 21.5/ 27
(520mm/540mm/550mm/685mm)
Fork Width (e): 6(160mm)
Standard Fork Lengths (L): 38.5/43.3/45/48
(980mm/1100mm/1150mm/1220)
Fork Height: Lowered (h13):1.4~~2.9 (35mm~~80mm)
Raised (h2): 3.5~~7.9 (90mm~~200mm)
Steering Wheel :200x65/180x62/150x50mm
Fork Wheel :80/74/65/50/34
Truck Weight: 165~230lbs.(75kg~102kg)
Packing(Pieces/Pallet): 6units/1package

One 20 container load(pieces): 144/180units


3)Pictures  Hand Pallet Truck
 

Sinolift Good Price CE Hand Pallet Truck

Sinolift Good Price CE Hand Pallet TruckSinolift Good Price CE Hand Pallet TruckSinolift Good Price CE Hand Pallet TruckSinolift Good Price CE Hand Pallet TruckSinolift Good Price CE Hand Pallet Truck

 

4)Workshop  Hand Pallet Truck

Sinolift Good Price CE Hand Pallet Truck

 

5)Certificate  Hand Pallet Truck

Shanghai Sinolift Equipment Co., Ltd is a production, design, manufacture, sales and service in one integrated production and trade enterprises. Main types of forklifts, material handling, storage and lifting products, also offer a variety of wire harnesses, TFT rule processing business, and produce a variety of OEM memory cards. Products are used in Germany and Japanese technology, all products passed "TUV", "CE", "GS" and "ISO9001" international quality system certification, the application of new technologies has unique.

 

6)Terms and Service  Hand Pallet Truck

Lead time

3-4 weeks

Packing

Standard export fumigated wooden pallet, foam rubbers

Payment term

T/T payment in advance; L/C at sight

Lead term

FOB Shanghai or CFR/CIF

Warranty period

12 months

Shipping method

by sea or air; by express

 

7) Warranty Policy and Service Program  Hand Pallet Truck

SINOLIFT give our customer warranty for each forklifts, pallet trucks (pallet jacks), stackers, table lifts , access work platform and drum handling equipments which remind us that we are always responsible for promotion our service.

 

Please check the warranty policy for the line of SINOLIFT material handling equipments from our sales department. Please note the warranty is for end user who purchase direct from SINOLIFT.

 

If your products from local distributor, please contact them. We provide full line after-sales service for our distributors. SINOLIFT believe local strategy is the best way for our distributors and local customers.

 

SINOLIFT offer all of handling equipments are reconditioned to our specifications, which come with a 12 months warranty on major components and 180 days on wearable items

 

8) Why choose us?  Hand Pallet Truck

1- We're a material handling company, a pioneer in the industry in China, we've been leading the Chinese warehouse equipment industry since 2001. Sinolift products have been delivered to more than 80 countries.

 

2- We are unique, which means you will have a unique partner with unique trucks in the market, in long term. We are not assembling, 95% core parts are produced by ourselves, for example EPS, Hydraulic units, driving units are all produced by Sinolift, the only one in China. And Sinolift is keeping on investing 30% of its margin on R&D. At present, Sinolift is the only producer who delivers EPS as standard on most models.

 

3- Strict Quality Control: 48 hours 100% inspection of electronic parts test, 100% Quality Control before delivery, including Noisy, Driving, Lifting, and Welding inspection. Sinolift Quality has been accepted by world market, 13 world famous brand names are cooperating with Sinolift.

 

4- Full range products, High-Quality and economic models are both available from Sinolift, we have resources to help our partners to open the market easily.

 

5- Sinolift has a whole set of failure predication, repair, maintenance data which will reduce 60% of the dealer's after-sale service cost.

 

6- Universal core parts and design between different models. Structure of Sinolift products and 80% core parts are universal between different models, which will reduce greatly service parts stock and make the job of service people much easier.

 

7- Most parts are available, no matter assembly or small components, because it’s produced by Sinolift itself. You don’t need to replace any assembly when its components are damaged, which will help to save 90% of the replacements parts cost sometimes.

 

8- Fast. Fast delivery time, Fast service and communication. Within one hour Sinolift will respond and within 3 hours we will offer the solution. Less than 15 days standard delivery time for electric products.

 

9- We don’t ask more though we do much better! We offer reasonable price level!

 

9)FAQ  Hand Pallet Truck

 

No.

Faults

Causes

Trouble shooting

1

The forks can’t be lifted to the max. lift height.

hydraulic oil is not enough

Add appropriate filtrated working oil.

2

The forks can’t return to the lowest position.

Too much hydraulic oil.

Take out appropriate working oil.

Some parts are deformed or blocked.

Replace the parts or repair.

3

The forks can’t drop after lifted.

The control valve is abnormal.

Readjust the unloading device.

The parts are deformed or damaged.

replace the damaged and deformed parts.

4

Hydraulic oil leakage

The oil seal is unavailable.

Replace the oil seal

The pump core and the surface of the plunger is damaged or worn.

Replace the core, plunger and the damaged parts

The coupled places become loosen.

Fasten the loosened place again.

5

The fork can’t be lifted.

The viscosity of the working oil is too high, or there’s no working oil.

Check the hydraulic oil or replace it.

There’s impurity in the oil.

Clear up the impurity oil and add new working oil.

The valve is abnormal.

Readjust the unloading device

6

The forks drop immediately after they are lifted; the handle returns or the forks drop markedly after they are lifted.

The valve of oil pump is blocked by abnormal matter.

Open the control valve and take out the parts. Then re-install the parts after they are cleaned.

 

 

 

Contact Supplier

Mr. David Deng Manager of overseas Chat Now
Telephone
86-21-58003681
Mobile
008613817572420
Fax
86-21-68014262
Address
NO.2477,Dachuan Road,Nanhui Industry Park,Shanghai,China Shanghai

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > General Industrial Equipment > Material Handling Equipment > Other Material Handling Equipment
Categories
Hi~