Feiyide PP Water Rinsing Tank For Hardware Electroplating Machine
USD $800 - $3,500 /Set
Min.Order:1 Set
Dongguan Feiyide Automation Equipment Co., Ltd.
1.High quality and reasonable price
2.PP material
3.Anti-corrosion
4.Customer designed
5.Strong structure.
We Feiyide have been in China for decades and we are specialized in making plating machines such as plating line,plating tank,plating barrel,rectifier,filter pump and water/gas treatment plant etc.
Packaging details: wooden package
Transport: DHL, FEDEX, UPS, TNT,Air shipping, Boat shipping.
We are highly appreciate if you can provide the details information.
1. The productivity: xx per hour, xx hours per day.
2. The size for your product: length:xx, width:xx, height:xx, diameter:xx.
3. Your plating process:
4. The size of tank you need: length:xx, width:xx, height:xx.
5. The size of barrel you need: length:xx, aperture:xx.
6. Equipment Model: (Automatic, semi-auto or manual):
7. The power of your country: voltage:xx, current:xx, single phase/diphase/triphase
Main products:
electroplating barrel
electroplating tank
electroplating production line
Preplating treatment equipments:
Polishing machine, oil removing machine, ultrasonic machine
Postplating treatment equipments:
Waste water/gas treatment plant, oven, dehydrator, dryer
Other peripheral equipments:
High-frequency switching power supply, rectifier filter pump, heater, temperature controller, titanium basket, industrial water purification machine, industrial chiller, etc.
1.Q: We need plating machine for ×××, could you send me a quotation?
A: Because plating machine is always customized for different products, we’d like to send you quotation and make the design for you based on knowing detailed information from you first.
2.Q: What is the necessary information you need for design?
A: The plating prosess you have had, The capacity of your per products, The material, weight, size, and surface area of your per product, The thickness of plating layer, Your working hours per day, Type of salt spray test and time, Workshop dimension and so on
3.Q: What’s the lead time for one project?
A: It usually would take about 15-30days for production and the time is based on specific projects.
4.Q: How can I carry out my work if I plan to set up a new plating line?
A:It would be better if we could communicate with your chemical liquid supplier on the process details first. Besides, professional engineer is also important for your project.