Feiyide vibration polisher for jewelry rotary tools jewelry polisher
USD $450 - $1,000 /Set
Min.Order:1 Set
Dongguan Feiyide Automation Equipment Co., Ltd.
Feiyide automatic vertical electroplating machine for copper faucets
Feiyide DC/AC12v500a bridge electroplating rectifier for chrome electropolishing
Feiiyde Fast Cooling Refrigeration Machine/Compressor for Plating Zinc
Feiyide Industrial Water Heater With Oven Electroplating Machine Burning Natural Gas
Feiyide Plating Machine Double Type Polishing PP Barrel for Cooper Gold
Feiyide Electroplating Equipment Stainless Steel Plating Tank for Copper Chorme Plating
Feiyide vibration polisher for jewelry rotary tools jewelry polisher
Vibrating polisher for jwelry rotary tools
1.reliable performance
2.high rigidity
3.low noise
All of our machines use high-quality imported material and most advanced equipment
production technology .
We also have highly skilled and experienced workers standardized production process.
So we can provide customers with the most excellent and suitable service.
Dongguan Feiyide Machinery Equipment Factory is a professional manufacturing enterprise of electroplating machine which collects together R&D, production and sale. Our company aims
to further research and development of plating equipment and provide customers with the most
excellent and suitable service.
Main product:
electroplating barrel
electroplating tank
electroplating production line
Preplating treatment equipment:
Polishing machine, oil removing machine, ultrosonic machine
Postplating treatment equipment:
Waste water/gas treatment plant, oven, dehydrator, dryer
Other auxiliary equipment:
High-frequency switching power supply, rectifier filter pump, heater, temperature controller, titanium basket, industrial water purification machine, industrial chiller, etc.
Automatic Barrel Galvanizing Machine Automatic barrel nickel plating machine automatic barrel chrome plating
Automatic rack plating equipment Automatic ABS rack plating equipment
Why choose us?
1. Advanced technology
We have a good cooperation with first class chemical liquid supplier, so we can provide environment-al, economic design and suitable process design for production.
2. Optimized electroplating products’ design
We have optimized design system for plating tank, plating barrel and plating line, framework and
control system. Over 15 years design and construction experience.
3. Using high-quality material and equipments
4. Provide process training
We offer training course of technical certification for customers and the directors are with over 10 yea-rs’ experience.
5. Service assurance
We provide 7*24 hours multilingual services(Chinese, English, French, Russian, Arabic, Japannese).
Global Location
Large storage warehouse
DMS equipments: online failure analysis and maintenance system.
Packing: According to the different products and quantity are packed in a wooden container, such as 20GP/40GP/40HQ.
Shipping: By sea or according to the special request of the buyer.
1.Q: We need plating machine for ×××, could you send me a quotation?
A: Because plating machine is always customized for different products, we’d like to send you
quotation and make the design for you based on knowing detailed information from you first.
2.Q: What is the necessary information you need for design?
A: The plating prosess you have had, The capacity of your per products, The material, weight,
size, and surface area of your per product, The thickness of plating layer, Your working hours
per day, Type of salt spray test and time, Workshop dimension and so on.
3.Q: What’s the lead time for one project?
A: It usually would take about 15-30 days for production and the time is based on specific projects
4.Q: How can I carry out my work if I plan to set up a new plating line?
A:It would be better if we could communicate with your chemical liquid supplier on the process details first. Besides, professional engineer is anso important for your project.
We guarantee 18months warranty after the equipment was passed test. Seller react during 48 hours after receive report. The warranty will be recounted if change the contract's equipment or the accessory is for repair. If the equipment stand or change after debug, the buyer can
require return the equipment and seller have to move the equipment within 7 days.
We can provide you the following service:
1. Project design
2. Manufacturing
3. Installation and test
4. After-sale service