Metal Roofing Sheets Making Tile Roll Forming Machinery
USD $10,000 - $15,000 /Set
Min.Order:1 Set
Cangzhou Best Machinery Manufacturing Co., Ltd.
Metal Roofing Sheets Making Tile Roll Forming Machinery
Decoiler ---> Feeding Guide ---> Roll Forming ---> Pressing ---> Cut-to-length ---> Run out table
Material thickness | 0.3-0.8mm |
Diameter of shaft(solid shaft) | 70mm |
Roller | 15 steps |
Material of shaft (solid shaft) | (high grade) 45# Steel, quenching and tempering treatment |
Material of roller | 45# steel polished and coated with chrome HRC55-60° |
Reducer | 8# cycloid reducer (high grade) |
Power of main motor | 4 KW |
Cutting | hydraulic cutting after roll forming |
Hydraulic power | 3kw |
Driven | 1 inch chain |
Voltage | 380V/50Hz/3phase |
Control system | PLC Frequency Control System with touch screen |
Assorted parts | Technical Specification |
No.1 Manual uncoiler | To support steel coil and uncoil it in a turnable way. Steel coil is uncoiled by hand. Loading capacity:5T |
No.2 Feeding Table | Put the raw material(steel plate) through the beach to manufacture and process, it can guarantee that the products are neat, flat |
No.3 Pump Station | Power:4kw, Hydraulic oil: 40# , hydraulic oil into the hydraulic oil tank ,the pump drives the cutting part moving |
No.4 Computer Control Cabinet | The finished length is adjustable. The system is easy to operate and use |
No.5 Output table | used to collect the finished products; Made of welded steel pipes and supported roller to transmit the products |
1.Professional technicians for loading to make sure machines load into container without any damage and all included.
2.Usually roll forming machine may need one 40GP to shipping.
3.Please provide us the nearest port name, we will ask shipping cost and arrange shipping for you
Warranty: One year, provide technical guiding , production ,installation, debugging and maintenance service.
Quality Control: independent QC departments both in the company and factories which strictly control the quality of each process to enable production lines to reach Chinese National Standards, even International Standards.
Technology R&D: R&D centers and innovative designing teams for different kinds of production lines.
Training
The buyer should charge of visa, return ticket, food and accommodation overseas and USD100/person/day for salary. Training time: one week (contains the time of installation and adjustment)
What do you care:
1) Q: Do you have after sales support?
A: Yes, we are happy to give advice and we also have skilled technicians available across the world. We need your machines running in order to keep your business running.
2)Q: How do your machines compare with other big companies in this market?
A: We are up to date with the latest technology and improve our machines accordingly
3) Q: Will you deliver the right goods as ordered? How can I trust you?
A: Yes, we will. The core of our company culture is honesty and credit. Best is ALIBAB’s Gold supplier with BV assessment and CE certificate.
4)Q:What can you do if the machine broken?
A:Our machine's warranty period is 12months,if the broken parts can't repair,we can send the new parts replace the broken parts freell,but you need pay the express cost yourself.if after warranty period,we can through negotiationfor to solve the problems,and we supply the technical support for the whole life of the equipment.
5) Q:Can you be responsible for transport?
A:Yes,please tell me the destination port or address.we have rich experience in transport.
6) Q:Can you supply the raw materials?
A:Yes,we can supply the galvanized steel coil,galvalume steel coil,color steel coil,and aluminum coil.
Hope we could establish win-win business relations in the soon future!
Contact me by WHAT'S APP:0086-15081471140 or send email to lily20130102 .Your satisfaction and recognition is the goal of our efforts!