Product Details

Round nylon Standoff/standoff for PCB/ABS standoff

Place of Origin Zhejiang, China
Brand Name SINCO
Model Number OEM

Product Features

Product Description

  Round nylon Standoff/standoff for PCB/ABS standoff

  •      

    Specification

    1)Material:          

     Aluminum 6061-T6, 7075-T6, Stainless steel 304, Stainless steel 316, Carbon steel 1008, 1020, Alloy steel 4140, 4340, Brass 36000, 37710, SS,Casting iron,Copper, Bronze, Titanium Alloy,Powder metal, Other Exotic Metals, Engeneer plastic POM,Delrin, ABS, PA6, PA66 etc.

     

    2) Surface treatment:

     

    Anodizing ,Blacking, zinc plating, chrome plating and nickel plating for the carbon steel,Tumbling ,Galvanizing,Chemical film, Powder, Passivation, Sand blasting, Brushing & polishing etc.  

     

    3) Our services:

    CNC Machining center,CNC turning, CNC turning and milling compound processing, 3/4/5 axis CNC milling, Casting&forging,Roll mill,wire-cutting, EDM, griding,CNC cutting,laser cutting service,stamping,bending and cutting, etc.

     

    4) Drawing format

    . pdf/.dwg/.igs./.stp/x_t. etc

    5) Terms of trade:

    EXW, FOB, CIF

    6) Terms of payment:

    T/T , L/C, Western Union,Paypal

    7) Packing:

     Foam, Carton, Wooden boxes

     

    8) Inspection

    Complete inspection lab with Micrometer, Optical Comparator, Caliper Vernier, Depth Caliper Vernier, Universal Protractor, Clock Gauge, Internal Centigrade Gauge

    Round nylon Standoff/standoff for PCB/ABS standoffRound nylon Standoff/standoff for PCB/ABS standoffRound nylon Standoff/standoff for PCB/ABS standoff

 Round nylon Standoff/standoff for PCB/ABS standoffRound nylon Standoff/standoff for PCB/ABS standoff

We can provide any size as you like!

application

 Round nylon Standoff/standoff for PCB/ABS standoff

Packaging & Shipping

 Round nylon Standoff/standoff for PCB/ABS standoff

Shipping & Payment

 Round nylon Standoff/standoff for PCB/ABS standoff

  • TNT: about 5-7 working days could reach your side normally
  • EMS: need 10-15 working days to reach your side
  • UPS: special express for North America,need 3-5 working days
  • DHL: normally 3-5 working days could reach your side
  • FEDEX: normally 3-10 working days could reach US and European
Company Information

 Round nylon Standoff/standoff for PCB/ABS standoffRound nylon Standoff/standoff for PCB/ABS standoff

 

Round nylon Standoff/standoff for PCB/ABS standoffRound nylon Standoff/standoff for PCB/ABS standoff

Certifications

 Round nylon Standoff/standoff for PCB/ABS standoff

Our Services
  • As a comprehensive enterprise with an integration of R&D, design,    production, we have highly effcient  production line, advanced quality testing instruments, excellentproducts and packing
  • Our company has passed the international quality system authentication of ISO9001.
  • We enjoy a good reputation and sell productions to dozens of countries.
  • We insist that quality and honesty come first.
  • Anny will be very happy to answer your questions in 24 hours.
FAQ

Q1:How to guarantee the Quality of Industrial Parts?

 

A1: We have the integrated system for industrial parts quality control. We have IQC (incoming quality control), IPQCS (in process quality control section), FQC (final quality control) and OQC (out-going quality control) to control each process of industrial parts prodution.

 

 

Q2:What's the Advantage of Your Parts for Industry Products?

 

A2:The advantage of our products is the competitive prices, fast delivery and high quality. Our employees are responsible-oriented, friendly-oriented,and dilient-oriented. Our products are featured by strict tolerance, smooth finish and long service time 

 

 

Q3:what are our machining equipmengts?

A3:Our machining equipments include CNC milling machines, CNC turning machines, stamping machines,hobbing machines, automatic lathe machines, tapping machines, grinding machines, screw machines, cutting machines and so on.

 

 

Q4:How Long is the Delivery for Your Industrial Part? 

A4:Generally speaking, it will take us 15 working days for machining parts and 25   working days for stamping parts products. But we will shorten our lead time as soon as possible according to customers' demands.

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now