High Quality Nema 11 Stepper Motor
USD $4.2 - $6 /Piece
Min.Order:1 Piece
2015 Hottest PLA 3.0mm 3D Printing Filament pla 1.75 filament with 16 colors available
3D printer NTC thermistors NTC-MF52AT 100K 3950 can be 1% precision sensors
Dedicated temperature thermocouple, K type thermocouple for 3D printer
3D printer NTC thermistors 100K/100 ohms can be equipped MK2a 1% precision sensors
3d printer part NTC 100k thermistor 1 meter wire with JST terminals
High Quality Nema 11 Stepper Motor
Quick motor parameters
Item | nema 11 hybrid stepper motor | Brand | SINCO |
Flange size | 28mmx28mm | Step angle | 1.8degree |
Body | 28mm~50mm | No of leads | 4 or 6 |
Holding torque | 0.45Kg.cm~1.2Kg.cm | Shaft diamter | 5mm |
Weight | 0.06~0.15kg | Matched Driver | FMDD50D40NOM/FMDD50D45NOM |
Torque curve for reference
Detailed Images
Cixi sinco machinery factory is a professional engaged in non-standard custom lathe parts, fasteners, products processing, plastic non-standard parts processing customized enterprise, the company was founded in 1995. In 20 years the company has been uphold: quality first, service first, focus on the concept of professional. After 20 years development, it is the most professional fastener products in zhejiang processing customization enterprise.
Q1:How to guarantee the Quality of Industrial Parts?
A1: We have the integrated system for industrial parts quality control. We have IQC (incoming quality control), IPQCS (in process quality control section), FQC (final quality control) and OQC (out-going quality control) to control each process of industrial parts prodution.
Q2:What's the Advantage of Your Parts for Industry Products?
A2:The advantage of our products is the competitive prices, fast delivery and high quality. Our employees are responsible-oriented, friendly-oriented,and dilient-oriented. Our products are featured by strict tolerance, smooth finish and long service time
Q3:what are our machining equipmengts?
A3:Our machining equipments include CNC milling machines, CNC turning machines, stamping machines,hobbing machines, automatic lathe machines, tapping machines, grinding machines, screw machines, cutting machines and so on.
Q4:How Long is the Delivery for Your Industrial Part?
A4:Generally speaking, it will take us 15 working days for machining parts and 25 working days for stamping parts products. But we will shorten our lead time as soon as possible according to customers' demands.