hot sell co2 filler /co2 filling machine /Carbon dioxide filler (DGTM-C)
Negotiable /Set
Min.Order:1 Set
Raoyang Hongyuan Machinery Co., Ltd.
co2 filler /co2 filling machine /Carbon dioxide filler (DGTM-C)
DGTM-C filler for CO2 fire extinguisher is a special equipment for filling extinguishers with CO2 extinguishants automatically. It makes a comprehensive use of electronic, electric, and mechanical techniques and renders the whole filling processes safe, reliable, simple in operation, accurate in filling quantity and highly efficient.
DGTM-C Carbon dioxide filler is a new product developed by our scientific researcher after absorbing the advantages and excellency of CO2 filler at home and abroad,considering the characteristic CO2 inside canister is a mixture of gas and liquid. It is quickly and efficient in filling because it is the liquid transforming in the obturation between the pipe and container.It features compact structure, running steady, saving energy, filling nicety and with abroad usage.So it is an ideal equipment in the manufacturer and the maintainer of CO2.
B.The original pressure in the CO2 steel can is 3~5Mpa and the filling pressure is 6~10Mpa.
C.The filling speed: 1~6Kg/min.
D.Voltage: 380V&220V;
E. Power: 2.7KW.
2.The different table of the filling time and the filling amount of the machine.
3. The main structure
Refrigeration DGTM-C-filling machine carbon dioxide from motor, high pressure pump, precision pressure gauges, safety, refrigeration units, refrigeration cycle piping and components such as fans (according to another user with the necessary precision and controlled electronic said switch).
4, method of use
1, connected to power, power indicator light.
2, open-refrigeration cabinet, equipped with carbon dioxide cylinders on the cabinet stent (a caving 2), the word fixture Ⅱ good folder, and open the cylinder valve. Cover refrigeration cabinet covered.
3, open refrigeration power, temperature control instrument display the current temperature. Digital lower right corner of the decimal point beating, three minutes after the automatic start-up delay.
Note: Each compressor downtime can be delayed another three minutes, otherwise the compressor damage.
4, temperature settings
(1), enter settings: In order to prevent misuse, we must double-click the "Settings" button three times to enter settings.
(2), when the temperature controller to enter settings, temperature display stored value, the minimum level set by the show (on the left "lower limit" light bright), this may be "" button or the "" button to change parameters values can be set in the range 1-5 °C. Click the "Settings" button, the lower limit to be stored, caloric value is displayed (on the left "temperature" light-liang) by the same " button change. Can be set in the 5-9 °C. (Minimum temperature increase equivalent to the ceiling).
(3), and must set temperature End and then a "set" button within 16 seconds by any key, automatic temperature controller with settings, and settings to be stored, displayed numerical values for temperature measurement. Otherwise temperature controller can not be based on the new control settings. If you set out on the latter without a shutdown, the new settings will be preserved.
5, when the temperature dropped to a drawer temperature setting, and open fire extinguishers connected Ⅱ word fixture valve to the pump and piping from the air, when seen from the liquid, the fixture may be connected with the fire extinguishers.
6, well connected, the valve opened fire extinguisher fixture, due to the pressure will be part of the charge, such as not to increase the weight of fire extinguishers, open control switch, then the pressure increased pressure gauges, electronic display that the weight increase, when the required Weight, close control switch, filling completed.
7, when the carbon dioxide cylinder can be opened inadequate refrigeration cabinet cap, the fixture folder to another cylinder, and remove the bottles and put another bottle cooling.
5. Maintenance
1. New machine lubricants used for the first time after 40 hours of work should be replaced, the replacement for the second time 80 hours later replaced every 200 hours, while taking care to wash the oil pool.
2. Should be used at any time to check the connection is loose fasteners, if loosening should immediately fastening.
3. Stands, if not a long time should be within the pipeline and pump gas row over the net.
4. 6-10 months later, the motor need before and after the addition of bearing lubricant to ensure normal operation of motor.
5. Pump 500-600 hours in the workplace, should check the main components, such as connecting rod, piston seal, valve block, the plunger and, if necessary, replacement of the parts.
6. Contain carbon dioxide cylinders should be kept clean and there must be no dirt to prevent plug valve port.
7. Work has been completed, should be opened refrigeration cabinet caps, a drawer to keep dry.
6. Attention to the issues
1. This equipment must be well protected wiring.
2. Downtime or after work should be cut off power lines.
3. Electrical and all of this equipment may not be injected water lines and other debris.
4. Should try not to vibration, vacillating and serious damp places operations.
5. Cycle of the fan does not work, prohibited use of ventilation holes prohibited plug.
6. Prohibited in the overpressure circumstances filling.
7. Such as cold winter weather can be no refrigeration, can be derived directly irrigation.
Filling equipment for the use of carbon dioxide units, we must not and five to five.
Fifth, we must: (1) a higher-level departments in charge of issuing licenses, fire units can maintain production.
(2) a quality assurance system and the rules and regulations in line with the national standard operating process in order maintenance production.
(3) should be specially trained, serious and responsible work, a fixed appointment card operators, maintenance before production.
(4) must be well-ventilated, clean, spacious (more than 20 square meters) of the production sites in order maintenance production.
(5) a security barrier, the operator and equipment between the barrier must be greater than the equivalent strength of 120 mm-thick reinforced concrete strength, a high degree of the operator must be higher than the height of 300 mm above.
5 Do not: (1) Do not use GB4399-84 by not under pressure test done for filling fire extinguishers.
(2) Do not use without a good grounding device safety equipment, as well as fire-fighting equipment not covered by insurance agents fill a cylinder.
(3) Do not use the posts did not console, instrumentation, piping, fixtures, and weighing instrument with a wide range of inspection equipment for filling.
(4) Do not use does not comply with the relevant national standards cylinder, valves, electrical straw, insurance tablet accessories for filling.
(5) Do not use non-detection project Weighing, instrumentation and overdue inspection equipment filling.
Packing List
DGTM-C CO2 refrigeration filling machine 1 set
Ⅱ word fixture (with high-pressure hoses) 2 sets
Manual 1 share Quality Certification 1 share
Several gaskets