Prestressing Steel Arc Flat Anchor Head
USD $3 - $100 /Set
Min.Order:10000 Sets
Tianjin Zhenhua Prestressing Force Technology Co., Ltd.
Prestressing Steel Arc Flat Anchor Head:
1. Specification: for 12.7mm or 15.24mm pc strand
2. Model: BM13 or BM15
3. Certification: ISO,CCPC,CNAS,CRCC
4. 1 pair contains 2 pieces and 1 rubber ring
TYPE | BM13-2 | BM13-3 | BM13-4 | BM13-5 | BM15-2 | BM15-3 | BM15-4 | BM15-5 |
ANCHOR HEAD (mm) | 80 48 50 | 110 45 45 | 140 45 45 | 170 45 45 | 80 48 48 | 125 48 48 | 160 48 48 | 195 48 48 |
ANCHOR PLATE (mm) | 140 150 80 | 150 160 70 | 175 200 70 | 200 230 70 | 140 150 80 | 150 190 80 | 185 220 80 | 215 285 80 |
CORRUGATED DUCT(mm) | 50 22 | 60 22 | 74 22 | 90 22 | 50 22 | 60 22 | 74 22 | 90 22 |
Prestressing Steel Arc Flat Anchor block for bridge concrete construction:
1. prestressed concrete wedge anchorage post tensioning systems can be used efficiently in all applications of Building and Civil Engineering works including
2. The concrete anchorage systems are commonly used in bridge construction as well as other civil Engineering structures such as Silo, Water tank etc.
The systems are normally adopted for bonded tendons. The tendons consist of a bundle of strand with a nominal diameter of 0.5" (12.7 mm.) or 0.6" (15.2 mm.).
3. The strands are individually gripped in one anchor head unit and transmits their prestressing force by means of anchor plate casting unit type M.
4. For each anchor size a special spiral reinforcement is provided at the anchor plate casting to give adequate splitting reinforcement for burstling stresses developed at the anchorage zone.
5. The strands in tendon are stressed simultaneously by means of a multi strand stressing jack from capacity 1,100 KN up to 5,000 KN. In case of small size tendon unit such as type M405 the strands can also be stressed individually by means of mono jack.
6.To ensure corrosion protection and to give adequate bond strength, the tendons are filled with suitable cement grout mix after complete stressing of the strands.
Prestressing Steel Arc Flat Anchor Head :
FAQ
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample but do not pay the cost of freight.
A: 50% T/T in advance ,balance before shippment.
We provide after-sale service, technical support, personalization and processing, production on-demand and strictly in accordance with the buyer requirements to provide quality services. Provide engineering construction for bridge,railway,building etc,and maintenance and reinforcement of bridge.We have a strong engineering team who are all qualified and resolve kinds of problems during construction.If you have another question, pls feel free to contact us.