For electric water pump motor price single phase ac motor speed control
USD $100 - $3,000 /Set
Min.Order:1 Set
Shenzhen EMHEATER Technology Limited
For electric water pump motor price single phase ac motor speed control
three phase to three phase 320V~460V VFD drives
EM11 is first class frequency inverter with very strong software and hardware.
It has servo drive feature, with perfect speed control mode, and excellent torque control mode.
It can save 2 group motor parameters , and can drive synchronous motor and asynchronous motor.
It has sensor-less vector control (SVC), vector control+ PG; V/F control and V/F separation control.
It has 49 kinds digital input functions and 38 kinds digital output functions.
It has S curve of acceleration and deceleration, user can self defined S curve turning time.
The IGBT carrier frequency canauto adjustment according to heatsink temperature.
35 kinds protection function, including auto detecting short circuit after power on.
Including textile swing frequency and skip frequency function, etc.
Voltage Range:220V~240V; 380V~460V.
Input Frequency Range:45~65Hz.
Output Voltage Range:0V~rated input voltage.
Output Frequency Range:V/F( 0~3000Hz); Vector Control (0~300Hz).
Overload Capacity:60s with 150% of rated current, 3s with 180% of rated current.
From 0.75~7.5KW Plastic house; 11~400KW is metal house.
Speed Accuracy: ±0.5% (SVC); ±0.02% (VC).
Pulse setting input: 0Khz~100Khz.
All model built-in RS485 card, and approved by CE.
EM11-G3/P3 models are integrated IGBT.
The malfunction ratio is 0.1%within 18 months warranty.
Product Photo:
three phase to three phase 320V~460V inverter
Q1. How to play an order? What about prices?
A1: Play an inquiry or contact with online service, after receiving your inquiry we will reply you with prices and information; Or catalog with full prices, thank you.
Q2. Can i have my logo printed on the products and packing?
A2: Totally acceptable, OEM service grown up for 15 years, thank you.
Q3.What is your payment terms?
A3: For sample: Paypal, west union;
For production: T/T, L/C, D/A or negotiable terms.
Thank you.
Q4.What would the delivery time be?
A4: Regularly 30 days after sample confirmed, ahead to 15-20 days if urgent, thank you.