Fluidized granulator for Chinese traditional medicine in chemical industry
USD $12,000 - $18,000 /Set
Min.Order:1 Set
Changzhou Yibu Drying Equipment Co., Ltd.
Preface
Fluidized bed drying can be used in the entire powder processing industry. In the pharmaceutical industry, this innovative method has replaced the time-consuming tray drying long ago: The drying process with fluidized bed drying reduces the drying time in the drying oven by approximately twenty times. In addition, fluidized bed drying provides controlled and uniform drying conditions compared to the uneven drying in trays.
For the process variants spray granulation, spray agglomeration or spray coating, it should be noted that not only the moisture needs to evaporate until it has reached a defined residual value, but also that drying takes place during the entire spray process. Too high inlet air temperatures can lead to insufficient liquid bridges, instable granulate structures or inhomogeneous looking films.
Fluid bed to achieve fast heat transmission of medium.
Seal negative pressure operation, there is no dust.
Because of using anti-static material as filter, it is safe in operation;
The equipment has no dead corner so it is easy to clean fully and there is no cross pollution;
It is in conformity with the requirements of GMP.
Feature :
The structure of fluidization bed is of round so as to avoid dead corner. Inside the hopper there is a stirring device in order to avoid agglomeration of raw material and forming canal of flow. The granule is discharged through the method of turning over. It is very convenient and full. The discharged system can be designed as request.
It is operated at the conditions of negative pressure and seal. The air is filtered. Therefore it is simple in operation and convenient for cleaning. It is an ideal equipment that is in conformity with the requirements of GMP.
The drying speed is fast and the temperature is uniform. The drying time is 20-30 minutes normally.
The electronic systems and their safety should comply with the requirements set forth in 21 CFR Part 11 and GMP Annex 11;
The data should be collected at appropriate time intervals and stored in the system in a fixed format that can be printed out/read;
Production process
Design → Raw material inspection →laser cutting machine→ Welding→ Inspection → Polishing → Inspection→Assembling → inspection → Package → Delivery
From design to assembly and then ship the unit, every step we require our workers to control the quality strictly, so that each unit can be delivered perfectly.
(raw Material ) (SS sheet cutting )
(welding) (inspection )
(Polishing) (Polishing machine)
(Packing) (Packing)
(Packing and delivery the goods)
Glance at the equipment at customer site
Our Services
Pre-service
Act as a good adviser and assistant of clients to enable them get rich and generous returns on their investments.
1. Introduce the product to the customer in detail, answer the question raised by customer carefully;
2.Make plans for choice according to the needs and special requirements of users in different sectors;
Sale service
1. Ensure product with high quality and pre-commissioning before delivery;
2. Delivery on time;
3.Provide full set of documents as customer’s requirements.
After-sale service
Provide considerate services to minimize clients’ worries.
1.Assist clients to prepare for the first construction scheme;
2.Install and debug the equipment;
3.Train the first-line operators;
4. Examine the equipment;
5.Take initiative to eliminate the troubles rapidly;
6.Provide technical support;
7.Establish long-term and friendly relationship.
Service commitment
1. Provide clients one-year warranty to make sure the machine work well
2.We always keep certain inventory level of spare parts, which means the replacements can be sent to you timely;
3.Send every client a preferential quotation.
FAQ
1. Are you a manufacturer ,trading company or a third party
We are a manufacturer ,and we have started our production on 1970 and have the private company right since 1995.
2. Where is your factory located
Our company is located in Changzhou city ,Jiansu province,China .it is
In the middle of Shanghai and nanjing .
3.How can I go to your factory ?
You can fly to shanghai pudong or hong qiao international airport directly ,and then take the high speed train or bus to Changzhou station and then we can pick you up at changzhou station for our company . Our company is around 30~40km away from the changzhou station.
If you are in China now , you can fly to benniu airport ,or take the train or bus to our city directly .
We sincerely welcome to visit our company at any time
4. What’s your mini order ?
Our mini order is one set .
5. Is there any certificate of YIBU ?
Yes, we got ISO9001:2008 Quality Management System Certificate,ISO14001:2004 Environmental Management System Certificate, OHSHS18001:2004 Occupatinal Healthe and Safety Management System Certificate, ISO10012:2003 Certificate for the system of Inspection measurement and Test, CE, CE;SGS;TUV;GOST;UL;GMP also we got 60 item patent, CE;SGS;TUV;GOST;UL;GMP
6.Is there any standard of electronic systems?
YES The electronic systems and their safety should comply with the requirements set forth in 21 CFR Part 11 and GMP Annex 11; The data should be collected at appropriate time intervals and stored in the system in a fixed format that can be printed out/read;
Access to all input and output values should be provided by entering the user personal code and password. The system should ensure three-level access (Administrator-Supervisor-Operator). A detailed description of the access rights for each level should be included to the equipment functional specification (FS);