Shandong manufactory Supreme Quality up and down electric lifting desks
USD $3,000 - $6,000 /Set
Min.Order:1 Set
Shandong True Win Construction Material Co., Ltd.
1)Lifting structure is made up of high strength manganese steel rectangular tube.
2)With overload safety protection system.
3) The work platform can be extensible to increase working time and capacity.
4)It's self-propelled , conveniently moving and the steering system is easy to operate.
5)Dual rear wheels are equipped with water brakes, which make the deceleration smooth and reliable.besides, the speed-adjusting hydraulic motor guarantees the stable speed change .
6)The multi-directional controller makes the controlling of machine flexible andreliable.
7)It is compact in structure and makes full use of the storage space. It can pass through the job location through standard doorway.
8)Short charging time and long durable time of the battery.
9)Working heights ranges from 4m,6m,8m,9m,10m,12m,14m.
10) Platform is equipped with a level warning device (the user can select part of this section)
11) One person can complete in the air straight up and down ,forward, backward and turning all the action.
Description of up and down electric lifting desks:
can be customized
SJYS0.3-4 | SJYS0.3-6 | SJYS0.3-8 | SJYS0.3-10 | SJYS0.3-12 |
6m | 8m | 10m | 12m | 14m |
1900*800mm | 1900*800mm | 2300*1000mm | 2600*1000mm | 2900*1000mm |
4m | 6m | 8m | 10m | 12m |
2.05*0.8*1m | 2.05*0.8*1.1m | 2.45*1*1.4m | 2.75*1*1.6m | 2.75*1*1.6m |
0.8m | 0.8m | 0.8m | 0.8m | 0.8m |
1m | 1.1m | 1.4m | 1.6m | 1.6m |
1.1m | 1.1m | 1.1m | 1.1m | 1.1m |
1.6m | 1.6m | 2.3m | 2.4m | 2.4m |
300kg | 300kg | 300kg | 300kg | 300kg |
1.5m | 1.5m | 1.8m | 2.2m | 2.2m |
100mm | 100mm | 100mm | 100mm | 100mm |
1600kg | 1800kg | 2300kg | 2600kg | 2600kg |
250*80mm | 250*80mm | 300*80 | 300*80 | 300*80 |
Picture of up and down electric lifting desks:
A. Daily or refueling: Check the parts are good or bad Check hydraulic oil level and colour
B. Every 250hours or 3months: Change lubricating oil Check cylinders
C. Every 500hours or 6 months: Check tubes, pipes and value
D. Every 1000 hours or 1 year: Change hydraulic oil Grease rotation bearing and wear pads
E. Every 2000 hours or 2 years:Check hydraulic tank, lid and vent
F. Note: Maintain the chassis according to the Chassis’ Service manual
FAQ:
Q:Who are you? Trade Company or manufacturer?
A: We are manufacturer and we have our own trade company.
Q: When the product can be delivered?
A: Commonly the lead time will be within 15 days after payment.
Q:What’s the Min order to your company?
A:1 set.The sample order, if we have stocks, we will send out the products within 1 week.
Q:What’s the advantage of your company?
A:We have exported our lifts and service to more than 100 countries. We have speclized team work for you, you will get our feedback within 24 hours./ Germany and Italian advancedmanufacturering technology.
Q:What need you know when i inquiry to you ?
A: We need to know your Max Capacity,Platform size and Lift height.
up and down electric lifting desks