50 ton silo for cement new advanced design structure
USD $7,000 - $8,000 /Set
Min.Order:1 Set
Shandong Zeyu Heavy Industry Science And Technology Co., Ltd.
50 ton silo for cement new advanced design structure is designed specifically for cement silo export packing difficult, on-site produce difficulties, difficulties in transferring the site, ultra-wide transportation and many other problems. Suitable for the storage of grain, cement, fly ash and other bulk materials.
1) Component
The cement silo is assembled by the below components: silo body, ladders, guardrail, charging pipe, dust collector, pressure sage valve, hi-low metering, discharging valve.2) Structure
The cement silo is the cylindrical structure,four round legs support the bottom of the silo, the whole cement silo is the steel structure formed by welding, the dust collector and pressure safe valve is installed on top silo.Name: Dust collector
Brand: ZEYU
Original: China
During the cement is in transported, the operator must continuously press the motor button of the dust collector and shake down the cement attached on the bag, to prevent the bag blocked and cement silo with too much pressure to break.
Name: Pipe legs
Brand: ZEYU
Original: China
When silo working, it must be erected by the crane,and put it on the concrete foundation prepared, to keep the erected silo vertical with ground,and at last fix the silo bottom together with precast parts.
Name: Pressure relief valve
Brand: ZEYU
Original: China
One time the bag blocked, the pressure inner the silo is surpass the safe pressure of the pressure safe valve on silo top, the pressure safe valve will open and release inner silo, to prevent the accident of silo break.
Name: Butterfly
Brand: ZEYU
Original: China
when the cement transport equipment have fault, firstly to close the manual discharge valve on cone bottom, to prevent the cement flow out and bring the waste.when the cement transport equipment have fault, firstly to close the manual discharge valve on cone bottom, to prevent the cement flow out and bring the waste.when the cement transport equipment have fault, firstly to close the manual discharge valve on cone bottom, to prevent the cement flow out and bring the waste.when the cement transport equipment have fault, firstly to close the manual discharge valve on cone bottom, to prevent the cement flow out and bring the waste.
* Inquiry and consulting support.
* View our Factory.
* We can provide the skillful engineer to supply the best combination products and send him to the site to ensure the installed and debugging success.
* We provide the products one year warranty period.
91.8% Response Rate
91.8% Response Rate
91.8% Response Rate