Steel rave leveler truck ramp and chock
Steel rave leveler truck ramp and chock
Steel rave leveler truck ramp and chock
Steel rave leveler truck ramp and chock
Steel rave leveler truck ramp and chock
Steel rave leveler truck ramp and chock

Steel rave leveler truck ramp and chock

USD $3,000 - $5,000 /Set

Min.Order:1 Set

Supply Ability:
100 Set / Sets per Month
Port:
QINGDAO
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
Shandong, China
Brand Name:
Truewin
Model Number:
DCQY1.0
Lift Mechanism:
Telescoping Lift
Lift Drive / Actuation:
Hydraulic
Power:
2.2KW

Shandong True Win Construction Material Co., Ltd.

Business Type: Trading Company
Shandong China
Main Products: construction materials ,Hydraulic lift ,Lamp-post ,Solar energy equipment ,Garage and accessories

Product Details

                    Mobile dock ramp for warehouse  

Product Description

  This series are adjustable loading dock ramp for sale,they are mainly used in cargo table without handling facilities and moving handling place,and it is an auxiliary equipment of cargo handling used together with forklifts,and also its lifting height  is adjustable according to the height of car compartment.With the assistance of adjustable loading dock ramp for sale, forklift can directly drive into the car compartment to carry out batch handling and greatly improving the  efficiency and safety of loading &unloading cargo.

  Application :

Our products are widely used in terminals, stations, warehouses and other places. According to the different needs of users, as the special design in terms of dimensions, load bearing and so on. Ramps mounted on the side of the dock, and the dock floor and sides flush. Ramps may be on the deck, under the tilted outer end goods may be higher or lower than the flat-screen, and make the car high.

Steel rave leveler truck ramp and chock

Mobile Loading Dock Ramp Information

1> The regular mobile of this ramp is : width -2m length -11.2m,

2> Adjusting height range -0.8m-1.85m,

3> And it aslo can be designed and produced accordign to customers requirements .

4> This machine is suit for :often materail handling ,warehouse .wharf ,logistics center working place

   

Mobile Loading Dock Ramp (with landing gear) Dimension

1

Model Number:

DCQY -10

2

Rated Loading Capacity:

10 Ton

3

Working form:

With landing gear (manual one)

4

Max adjustable height:

1800mm

5

Overall length* Overall width:

11200*2100mm

Platform Size:

2400*2100mm

Slope Size:

7500*2100mm

6

Table Material:

Gear steel grating   (Function:anti-skidding, avoid ponding)

7

Lifting plate:

Size:1000mm        Plate Lip: 300*20mm

8

Landing gear

Quantity: 1 Pair      Static Load: 40 TON

9

Solid tire

Size: 500-8B          Diameter:450MM

10

Safety locking

Quantity: 2 pcs

Function: lock the container when loading and unloading


 

Foldable front lips(12mm steel plate) can meet the height changes of trucks.


  Steel rave leveler truck ramp and chock

 

Moves easily on two big pneumatic tires(solid tires available).


Steel rave leveler truck ramp and chock

 

A manual 2-speed hand crank for easy one-person height adjustment.
(Optional hydraulic pump or hand crank for positioning yard ramp height).

 

Steel rave leveler truck ramp and chock

  

Without installation and easy operation
Adopting high strength steel,structure is solid and durable
Easy and convenient maintenance
Improving working efficiency, reducing the manpower cost

 


Details&parts:
 
Steel rave leveler truck ramp and chock

 Certification&TradeAssurance:

 

Steel rave leveler truck ramp and chock

Hot Selling products:

Steel rave leveler truck ramp and chockSteel rave leveler truck ramp and chockSteel rave leveler truck ramp and chockSteel rave leveler truck ramp and chockSteel rave leveler truck ramp and chockSteel rave leveler truck ramp and chock

Team&Clients:

Steel rave leveler truck ramp and chock

Maintenance Schedule

A. Daily or refueling: Check the parts are good or bad Check hydraulic oil level and colour
B. Every 250hours or 3months: Change lubricating oil Check cylinders
C. Every 500hours or 6 months: Check tubes, pipes and value
D. Every 1000 hours or 1 year: Change hydraulic oil Grease rotation bearing and wear pads
E. Every 2000 hours or 2 years:Check hydraulic tank, lid and vent
F. Note: Maintain the chassis according to the Chassis’ Service manual

FAQ

FAQ:

Delivery Time?        (From 1 week to 1 month after we receive the order)

Payments?               (T/T and L/C, other kinds, pls contact with us)

MOQ?                        (1 set)

Trade term?             (FOB/CIF to your nearest seaport)

Application field?   (Construction, shipyard, industrial, airport, municipal garden or others)

Contact information

Steel rave leveler truck ramp and chock 


 

Contact Supplier

Mr. lichao lian Chat Now
Telephone
86-0531-85942227
Address
feng huang shan road Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > General Industrial Equipment > Material Handling Equipment > Lift Tables
Categories
Hi~