Port load/unload container dock ranp for forklift
USD $3,000 - $5,000 /Set
Min.Order:1 Set
Shandong True Win Construction Material Co., Ltd.
DCQY Mobile dock ramp
Heavier and stronger than the average forklift ramp, the steel mobile loading dock ramp is a reliable investment in a profitable future.
Application :
Our products are widely used in terminals, stations, warehouses and other places. According to the different needs of users, as the special design in terms of dimensions, load bearing and so on. Ramps mounted on the side of the dock, and the dock floor and sides flush. Ramps may be on the deck, under the tilted outer end goods may be higher or lower than the flat-screen, and make the car high.
Mobile Loading Dock Ramp Information | ||
1> The regular mobile of this ramp is : width -2m length -11.2m, | ||
2> Adjusting height range -0.8m-1.85m, | ||
3> And it aslo can be designed and produced accordign to customers requirements . | ||
4> This machine is suit for :often materail handling ,warehouse .wharf ,logistics center working place | ||
Mobile Loading Dock Ramp (with landing gear) Dimension | ||
1 | Model Number: | DCQY -10 |
2 | Rated Loading Capacity: | 10 Ton |
3 | Working form: | With landing gear (manual one) |
4 | Max adjustable height: | 1800mm |
5 | Overall length* Overall width: | 11200*2100mm |
Platform Size: | 2400*2100mm | |
Slope Size: | 7500*2100mm | |
6 | Table Material: | Gear steel grating (Function:anti-skidding, avoid ponding) |
7 | Lifting plate: | Size:1000mm Plate Lip: 300*20mm |
8 | Landing gear | Quantity: 1 Pair Static Load: 40 TON |
9 | Solid tire | Size: 500-8B Diameter:450MM |
10 | Safety locking | Quantity: 2 pcs |
Function: lock the container when loading and unloading |
Foldable front lips(12mm steel plate) can meet the height changes of trucks.
Moves easily on two big pneumatic tires(solid tires available).
A manual 2-speed hand crank for easy one-person height adjustment.
(Optional hydraulic pump or hand crank for positioning yard ramp height).
Our products are widely used in terminals, stations, warehouses and other places. According to the different
needs of users, as the special design in terms of dimensions, load bearing and so on. Hydraulic loading ramps
mounted on the side of the dock, and the dock floor and sides flush
Certification:
Hot Selling products:
Team&Clients:
A. Daily or refueling: Check the parts are good or bad Check hydraulic oil level and colour
B. Every 250hours or 3months: Change lubricating oil Check cylinders
C. Every 500hours or 6 months: Check tubes, pipes and value
D. Every 1000 hours or 1 year: Change hydraulic oil Grease rotation bearing and wear pads
E. Every 2000 hours or 2 years:Check hydraulic tank, lid and vent
F. Note: Maintain the chassis according to the Chassis’ Service manual
FAQ:
Delivery Time? (From 1 week to 1 month after we receive the order)
Payments? (T/T and L/C, other kinds, pls contact with us)
MOQ? (1 set)
Trade term? (FOB/CIF to your nearest seaport)
Application field? (Construction, shipyard, industrial, airport, municipal garden or others)