Fruit tree pruning aerial hydraulic articulated lift platform
USD $3,000 - $5,000 /Set
Min.Order:1 Set
Shandong True Win Construction Material Co., Ltd.
Packaging Detail: | according to your requirements |
Delivery Detail: | Within 15 days |
Crank arm type overhead working truck, mobile convenience, folding boom structure is compact, and adopts the new type of high quality steel, high strength, light weight, direct access to the alternating current (ac) or use dc power start itself, construction speed is quick, the workbench can extend horizontally, as well as rise also can rotate, the obstacles to reach the working position, is the ideal high operating equipment
Hydraulic Articulated Lift Platform Parametets
Model | Lift height | Platfrom size(mm) | Load(Kg) | Dimensions(mm) | Self weight |
TS0.3-4 | 4m | 1650*800 | 300 | 1900*1000*1100 | 400KG |
TS0.8-4 | 4m | 1650*1100 | 800 | 1900*1200*1300 | 700KG |
TS1.5-4 | 4m | 1700*1500 | 1500 | 2000*1800*1500 | 1200KG |
TS0.3-6 | 6m | 1500*750 | 300 | 1700*900*1000 | 650KG |
TS0.8-6 | 6m | 1700*1200 | 800 | 2000*1500*1400 | 1300KG |
TS1.5-6 | 6m | 1800*1500 | 1500 | 2100*1800*1700 | 1650KG |
TS0.3-8 | 8m | 1640*750 | 300 | 1850*900*1390 | 720KG |
TS0.8-8 | 8m | 1800*1200 | 800 | 2300*1500*1500 | 1800KG |
TS1.5-8 | 8m | 2100*1500 | 1500 | 2600*2000*1800 | 2600KG |
TS0.3-10 | 10m | 2120*1200 | 300 | 2600*1500*1530 | 1600kg |
TS0.5-10 | 10m | 2200*1200 | 500 | 2600*1500*1550 | 1600KG |
1Lift height:4-22m
2.Loading capacity:300-1000kg
3.Easy operation, low maintenance
4.Platform size: 2600*1600mm
9.The operation is simple, easy to use, operation, especially could overhanging operation
10.Machine use diesel engine as power, and battery USES electric start since the leg, the lift, go by oneself, 360 o rotation operation
This series of elevator is widely used in municipal, electricity, street light, highway, port, advertising, gardens, residential property, the workshop of factories and mines and other industries a wide range of lifting operatio
1.After working, the lift platform must be fold and should be cut power supply off.
2.The machine should be kept inside room.
3.The joint of machine must be lubricated frequently.
4.The seal ring should be changed immediately when it does not work well.
5.The hydraulic components must be cleaned enough when they are changed. If the component is not available, the input part of oil cylinder should be sealed to prevent the crash and eyewinker of oil system.
6.The hydraulic oil must be changed in two months when the machine is first used. And afterward the hydraulic oil should be changed by the working situations.
1.Shandong true win construction materials co.,ltd is a professional manufacturer of aerial working platforms,logistics equipments and handling equipment for logistics
2.Our products come from China, but our service for the world
3.Our products are your exclusive, absolutely tailored professional design
4.we are alibaba China chamber of commerce in jinan, President of the unit quality absolute guarantee, you dare to buy I dare to compensa
any questions,do not hesitate to contact me
name:jacezhang
tel:86-0531-85942228
QQ:3243232708
address: A4-07, No. 3, Fenghuangshan Road, Tianqiao District, Ji'nan, Shandong, China (Mainland