HDPE 3-Skids Plastic Pallet Price
USD $8 - $150 /Unit
Min.Order:500 Units
Suzhou Haocheng Logistics Machinery Co., Ltd.
HDPE 3-Skids Plastic Pallet Price
l Durable,single faced,hygienic ;
l No splinters,4 way entry system ;
l Dimensionally stable in temperatures ranging from -40 °C to +70 °C ;
l Available without/with reinforcement profiles ;
l For frequent use,wear-resistant ;
l Stackable, reuseable .
l Place the pallet on the floor in an open area. Stack weighty items and flat objects onto the pallet at the start. Arranging heavy and flat items on the pallet first ensures a stable stacking base. Build a balanced stack and distribute weight evenly over the surface of the pallet.
l Loop shrink wrap around the entire stack of objects on the pallet. Shrink wrapping keeps items in place and prevents them from falling off the pallet when being moved
l Insert forklift forks underneath the pallet. Note whether you possess a two-way or a four-way pallet. Two-way pallets enable you to insert forks in on only two out of four ends. A four-way pallet allows you to insert forks on any side or end of the pallet. Lift forks and transport the pallet to its next destination.
Type | Model No. | Material | Pallet Size (LXWXH,mm) | Loading Capacity(Ton) | ||
Moving load | Static load | Shelf load | ||||
Double-side Plastic pallet
| HC-DS1010 | HDPE, PP | 1000X1000X150 | 1.5T | 5T | 1T |
HC-DS1050 | HDPE, PP | 1050X1050X150 | 1.5T | 6T | 1T | |
HC-DS1210 | HDPE, PP | 1200X1000X150 | 1.5T | 6T | 1T | |
HC-DS1111 | HDPE, PP | 1100X1100X150 | 1.5T | 5T | 1T | |
HC-DS1311 | HDPE, PP | 1300X1100X150 | 1.5T | 6T | 1T | |
HC-DS1411 | HDPE, PP | 1400X1100X150 | 1.5T | 6T | 1T | |
HC-DS1412 | HDPE, PP | 1400X1200X150 | 1.5T | 6T | 1T | |
HC-DS1212 | HDPE, PP | 1200X1200X150 | 1.5T | 6T | 1T | |
HC-DS1616 | HDPE, PP | 1600X1600X150 | 1.5T | 8T | 1T | |
HC-DS1616A | HDPE, PP | 1600X1600X150 | 1.5T | 8T | 1T | |
Cross Type Plastic Pallet
| HC-CT1208 | HDPE, PP | 1200X800X150 | 1T | 4T | 0.6T |
HC-CT1210 | HDPE, PP | 1200X1000X150 | 1T | 4T | 0.6T | |
HC-CT1111 | HDPE, PP | 1100X1100X150 | 1T | 4T | 0.6T | |
HC-CT1311 | HDPE, PP | 1300X1100X150 | 1T | 4T | 0.6T | |
HC-CT1212A | HDPE, PP | 1200X1200X150 | 1T | 4T | 0.6T | |
HC-CT1212B | HDPE, PP | 1200X1200X160 | 1.5T | 6T | 1T | |
3-Skids Plastic Pallet
| HC-3S1208 | HDPE, PP | 1200X800X155 | 1T | 4T | 0.6T |
HC-3S1111 | HDPE, PP | 1100X1100X155 | 1T | 4T | 0.6T | |
HC-3S1210 | HDPE, PP | 1200X1000X150 | 1T | 4T | 0.6T | |
HC-3S12510 | HDPE, PP | 1250X1000X150 | 1T | 4T | 0.6T | |
HC-3S1210A | HDPE, PP | 1200X1000X160 | 1T | 4T | 0.6T | |
HC-3S1210B | HDPE, PP | 1200X1000X180 | 1T | 4T | 0.6T | |
HC-3S1210C | HDPE, PP | 1200X1000X155 | 1T | 4T | 0.6T | |
HC-3S1312 | HDPE, PP | 1300X1200X155 | 1T | 4T | 0.6T | |
HC-3S1311 | HDPE, PP | 1300X1100X155 | 1T | 4T | 0.6T | |
HC-3S1212 | HDPE, PP | 1200X1200X155 | 1T | 4T | 0.6T | |
HC-3S540 | HDPE, PP | 540X345X55 | 0.1T | 0.2T | X | |
Nine feet Plastic Pallet
| HC-NF1208 | HDPE, PP | 1200X1000X140 | 0.5T | 2T | X |
HC-NF1111A | HDPE, PP | 1100X1100X140 | 0.5T | 2T | X | |
HC-NF1111B | HDPE, PP | 1100X1100X78 | 1T | 8T | X | |
HC-NF1111C | HDPE, PP | 1100X1100X107 | X | 6T | X | |
HC-NF1125A | HDPE, PP | 1125X770X150 | 0.5T | 2T | X | |
HC-NF1125B | HDPE, PP | 1125X770X150 | 0.5T | 2T | X | |
HC-NF1210 | HDPE, PP | 1200X1000X140 | 1T | 4T | X | |
HC-NF1208A | HDPE, PP | 1200X800X150 | 1T | 4T | X | |
HC-NF1208B | HDPE, PP | 1200X800X150 | 1T | 4T | X |
3-Skids Plastic Pallet
Nine Feet Plastic Pallet
Double-side Plastic Pallet
Cross Type Plastic Pallet
Q:Why choose Suzhou Haocheng Logistics Machinery Co.,LTD?
A:Because we are professional Manufacturer which has more than 16years OEM experience, most parts of products produced by ourselves.E.g. Pump and cylinder are produced by high-technology CNC machine;welding do use the aoto welding robot machine.
Q:What about the quality of the products?
A:We have five inspectionsteps during the production.
1th, inspect material according to ISO 2859
2th, 100% inspection in production process
3th, 100% inspection when assembling finished(Load Limiting Device Test and Proof Load Test)
4th, inspect products before shipment according to ISO 2859
5th, inspection by buyer (if need)
Note: We will ensure that 100% qualified before shipment
Q:What's the leadtime?
A:Nomally 45 days.
If you book more than 5 items mixed in one container, it will be 60 days.
If you book one item in one container, it will be 30 days.
Q:What about the guarantee?
A:One year after shipment.
If the problem coursed by factory side, we will supply free spare parts or products untill the problem solved.
If the problem coursed by customer, We will supply technic support and supply spare parts with lower price.
Q:Why your price is a little higher than other factory or trading company?
A:Because we would like to follow a win-win stratery so that we can have a long business relationship,which is good and important for both of us.
So we do not sell light weight products or sticker high capacity(like 5 ton sticker 10 ton)
We ensure that every products from Tongli are goods genuine and prices reasonable.