8m single mast hydraulic climbing work platform price
USD $1,600 - $1,600 /Set
Min.Order:1 Set
Shandong True Win Construction Material Co., Ltd.
Aluminum one man work platform
A.Aluminum-Alloy-Mast Lifts are made up of high grade aluminum profile.
B. It is mainly used for the installation and maintenance of the narrow spaces such as star hotels,modern workshops,business hall,hotels,lobby,restaurant,railway stations, exhibition hall and shopping malls.
C.The lifting height ranges from 4m to 18m and lifting capacity varies from 100 to 200kg.The power sources
could be 110,220V,380V or chargeable battery.
D.The control panels are available both on the lift platforms and the ground.
Features:
Dual operation system: on the working platform and the base.
Level adjustment before lift working:
Stabilizer for precise leveling:
Single Aluminum Lift are made up of high grade aluminum profile and equipped with the universal wheels, easily pushed around to the designated sites.
Specifications:
Model | PL6-1 | PL8-1 | PL10-1 | |||
Max. Platform Height | mm | 6000 | 8000 | 10000 | ||
Max. Machine Height | 7350 | 9460 | 11300 | |||
Min. Platform Height | 580 | |||||
Ground Clearance | 60 | |||||
Lift Rated Capacity | kg | 150 | 125 | |||
Platform Size | mm | 630*650 | ||||
Outspread Size | 2030*1840 | |||||
Electrical Source | AC | v | 220-240 | |||
DC | 12 | |||||
Aneroid Battery | v/Ah | 2*12/75 | ||||
Charger | v/A | 12/15 | ||||
Lifting Motor | AC | v/kw | 220/0.75-1.5 | |||
DC | 12/2.5 | |||||
Overall Length | mm | 1420 | ||||
Overall Width | 840 | |||||
Overall Height | 1920 | 2980 | ||||
Overall | AC | kg | 410 | 450 | 490 |
|
DC | 450 | 480 | 525 |
Packing of Aluminum lift :
Similar products:
Team&clients:
Certification&Trade Assurance:
FAQ:
Delivery Time? (From 1 week to 1 month after we receive the order)
Payments? (T/T and L/C, other kinds, pls contact with us)
MOQ? (1 set)
Trade term? (FOB/CIF to your nearest seaport)
Application field? (Construction, shipyard, industrial, airport, municipal garden or others)
A. Daily or refueling: Check the parts are good or bad Check hydraulic oil level and colour
B. Every 250hours or 3months: Change lubricating oil Check cylinders
C. Every 500hours or 6 months: Check tubes, pipes and value
D. Every 1000 hours or 1 year: Change hydraulic oil Grease rotation bearing and wear pads
E. Every 2000 hours or 2 years:Check hydraulic tank, lid and vent
F. Note: Maintain the chassis according to the Chassis’ Service manual