China Factory Steel Buttwelded reduce barred tee
China Factory Steel Buttwelded reduce barred tee
China Factory Steel Buttwelded reduce barred tee
China Factory Steel Buttwelded reduce barred tee
China Factory Steel Buttwelded reduce barred tee
China Factory Steel Buttwelded reduce barred tee

China Factory Steel Buttwelded reduce barred tee

USD $10 - $500 /Unit

Min.Order:1 Unit

Supply Ability:
10000 Piece / Pieces per Month
Port:
Tianjin
Payment Terms:
T/T

Quick Details View All >

Material:
Other, Iron, Carbon Steel
Technics:
Other, Casting, forged
Type:
Tee
Place of Origin:
Hebei, China
Model Number:
Tee10
Brand Name:
XFY-TEE

Henan Xinfengyi Enterprise Co., Ltd.

Business Type: Trading Company
Zhengzhou Henan China
Main Products: Seamless Steel Pipe And Fittings ,welding tube ,steel fitting ,flange ,casting pipe

Product Details

Product Description

 

Quick Details

Material:
Stainless Steel, stainless steel 304, 316, 316L, carbon steel
Technics:
Butt welded, punch
Type:
Tee
Place of Origin:
Hebei, China (Mainland)
Model Number:
Tee-001
Brand Name:
XFY-Henan 
Connection:
Male, butt welding or 
Shape:
Equal
Head Code:
Hexagon
Working pressure:
1.6MPa(232PSI).
Strict quality control:
100% inspected before delivery.
Competitive offer:
Europe quality level, competitive prices.
EN10312 diameter:
15, 18, 22, 28, 35, 42, 54, 76.1, 88.9, 108mm
JIS diameter:
15.9, 22.2, 28.6, 34.00, 42.7, 48.6, 76.1, 88.9, 108mm
Sealing ring material:
CIIR, EPDM, FKM...
Suit medium:
cold/hot water, compressed air, gas, oil etc
pipe fitting type:
coupling, tee, elbow, flange, reducer, male female pipe fitting
Direct supplier:
plumbing material direct China manufacturer and supplier

 

 

Packaging & Shipping

 China Factory Steel Buttwelded reduce barred tee

China Factory Steel Buttwelded reduce barred teeChina Factory Steel Buttwelded reduce barred teeChina Factory Steel Buttwelded reduce barred teeChina Factory Steel Buttwelded reduce barred tee

China Factory Steel Buttwelded reduce barred tee

China Factory Steel Buttwelded reduce barred teeChina Factory Steel Buttwelded reduce barred tee

 

Packaging & Delivery

Packaging Details:For press fittings: we pack press fittings in a poly bag to prevent surface scratch, and then pack them inside brown export cartons. 
For pipe: we pack the stainless steel pipes inside poly bag, so that it can prevent surface scratch, and keep dirts away from the inside of the pipes. 
If you have special requirement on packing, please tell us.
Delivery Detail:Within 7-30 days against payment.

 

 

 

Our Services

 

our factory service

 

1. Free sample can be provided

2. Small order is acceptable

3. Any third party testing is acceptable

4. 12Months quality guarantee

5. factory price

6. No damage, no bent

7. no burrs or sharp edges and no scraps

8. Free for oiled&marking

9. All goods can be checked by third party inspection before shipment

 

 

FAQ

 

FAQ

Q: Are you a factory or a company?

A: We are a retailer and wholesalers with the right of import and export (ISO certification). Welcome to our factory.

 

Q: What is your main product?

A: We produce seamless steel pipe , welding steel pipe and steel fittings.

 

Q: How to start business cooperation with your company?

a: tell us your requirements for details or tell me your specs of your products.

b. we offer our good price for you and need your confirmation.

c. we can provide the sample with no charge if you need, if you are happy with the sample, then we can confirm this order.

D . T/T the deposit and then we prepare for the production.

d.  Arrange the balance payment and ship the goods to you.

 

Q: What is your sample policy?

A: the sample is free.

Q: Our Advantage compare with same industry?

 

 One order have so many people to follows, during production there have a professional service!

 

Q: How fast can i get the quotation? 

 We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price,  please call us or tell us in your email so that we will regard your inquiry priority. 

 

Q: What is the trade terms and payment terms?

A: We trade with EXW, FOB, CFR, or CIF; payment with T/T, L/C, or West Union.

 

Q: What is the lead time?

A: Normally it takes 3-4 weeks 

 

 

 Any inquiry , please contact me free --George 

 

Henan Xinfengyi Enterprise Co., LTD
Add: Zidong steel enterprise zone, Guancheng district, 

 

Zhengzhou City, Henan, China
Fax/Tel: 86-371-86168338
Website:
Alibaba Website: http://www.fygg.en.china.cn

 

Contact Supplier

Mr. James Qi Manager Chat Now
Telephone
86-371-86168338
Mobile
0086-18638107588
Fax
86-371-86168338
Address
No.11, TIianyuan Steel-Market Zhengzhou,Henan

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Mechanical Parts & Fabrication Services > Pipe Fittings
Categories
Hi~