2016 Low Price Dyeing Cooling System Flake Ice Maker For Dyes Industrial Ice Machine
USD $5,000 - $100,000 /Set
Min.Order:1 Set
SNOWKEY Dyeing Cooling System
The physical traits of ice decide its ever-expanding application in the chemical industry.In the course of producing and synthesizing reactive AZO pigments and dyes,diazotization,coupling and condensation are necessary synthesization processer of production.Since large amout of heat is released in the three processes and ideal reactive condition should be 0~5°c,Large amount of ice must be added during chemical reactions to control temperature and ensure produce quality.
Scientific design and many years of engineering experience.
SNOWKEY will offer you the best scheme of tailor-made ice making machine system. We have not only supplied lots of ice flaker systems to customers from various places but also offered technological consultancy to them.
Safety and sanitation
SNOWKEY always aims at manufacturing the products up to high sanitary standards. Every component of our ice machines is made of SUS30 stainless steel, pure aluminium alloy or PE material, so none of our ice machine fall short of the international certification standards of HACCP and FDA. The ice produced by our ice machines is dry, pure, powerless and unlikely to lump in the lower part of the machines.
High reliability and low breakdown rate
SNOWKEY ice machines has adopted and consolidated international ice machine produced and processing technology and experience. Equipment structure is designed for resistance to high load and long-term use, through several decades of research, SNOWKEY has manufactured highly reliable ice flake equipment that can produce quality ice and stand over 26,000 hours of constant operation without breakdown. So far its products have found wide application in various fields all over the world.
High efficiency and energy saving
We have optimize the design of ice flake units to ensure that SNOWKEY internally-scraping ice flake units can function constantly without wasting energy. We have also adopted a special kind of alloy material and patent processing technology to ensure efficient heat conductivity. The freezing surface of the ice produced by SNOWKEY ice machines is over 1750 Square Meter/ton. Compared with other brands of units, SNOWKEY flake ice maker can produce more ice when the same compressor is used.
Simple maintenance and convenient moving
All our equipment is designed on the basis of modules, so its spot maintenance is quite simple. Once some of its parts needs replacing, it is easy for you to remove the old parts and install the new ones. Moreover while designing our equipment. We always take into full account how to convenience future moves to other construction sites.
Great adaptability and stable quality
SNOWKEY products can ensure good running and normal ice output at the environmental temperature of 5~40°C, and its specially-designed type can guarantee normal running even in the most unfavorable conditions(-30°C~60°C).
SNOWKEY ice machine can be equipped inside the container, and within the contain we also equipped the air cooler to ensure the stable temperature. avoid affects from outside, especially every parts are strictly inspection and test before assemble. Offer our customers stable, reliable and durable ice machine is our eternal goal.
Outstanding electric control system
——1. SNOWKEY ice machine adopts world famous brand such as Siemens, Schneider, etc. The machine service life is accordingly prolonged, and the maintenance cost is reduced.
——2. Full automatic control improves the refrigeration performance of the compressor to the best and the COP value improved. Energy-saving and high efficiency is realized.
——3. The machine can be easily operated in a direct-viewing way. Such signals as simple screen configuration and detailed parameter adjustment of the whole machine can be displayed during the maintenance time.
——4. SNOWKEY flake ice machine can realized high speed data exchanging such as chain infomtation from production menu to production data Therefore the working efficiency of design, installation and maintenance is improved.
Classic case:
Installation And Training On Site--the most professional engineer and the most effective working: