[ DATAN ] Good Quality double column vertical machining center
USD $40,000 - $95,000 /Set
Min.Order:1 Set
Hangzhou Datian CNC Machine Tool Co., Ltd.
1. An upgraded version of medium-sized vertical machining center.
2. High rigidity as high-speed milling machine.
3. Can be full-stroke high-precision machining.
4. Processing efficiency is increased by 30% comparing to the same specification of vertical machining center.
5. The flatness of the milled plane is enhanced by 10%.
X, Y axis adopt heavy duty linear roller guides, its low coefficient of friction improves its drive positioning and dynamic accuracy.
GQ series, the small gantry adopts high rigidity rectangle ram slide guide-way, its rigidity is improved by twice. This kind of gantry is able to withstand the axial and radial cutting forces, the vibration force, which makes the cutting faster and more efficient.
The previous gantry of six pieces is optimized for five ones. This can avoid assembly errors while improving the overall stability.
The workbench,100% set on the supporting surface, can ensure uniform coefficient of friction during the movement and help achieve high stability, long service life as well as heavy cutting.
The machine is suitable for processing mold, round and square parts of boxes, its Y direction space use is more efficient. Because the workbench is set through the column, its width and Y direction path are increased by 25%.
X/Y axis adopts roller linear guideway, comparing with the same specification VMC, its rigidity is improved by 20%. Roller screw and another moving parts are consistent with cnc gantry machine design standard.
After the contract is signed, you shall give 30% payment as deposit, then the contract comes into effect. Our sales manager and engineers will follow up your order.
Mass production is managed when sales manager receive your contract by fax.
CNC milling machine need 15 days.
CNC machining center need 25 days,
Gantry machining center need 45 days.
Time will be delayed if need special accessories.
According to the industry criteria, 70% payment should be paid after mass production is finished. Besides, we recommend you to choose wooden box packing to avoid and damage during the delivery.
Tel/Whatsapp:0086 15962410804
WeChat: 732023468
Skype: DATAN.harry