2015 super quality newest wall switch wall switch mould MAGIC MOULD TAIZHOU HUANGYANG
USD $500 - $5,000 /Set
Min.Order:1 Set
Taizhou Huangyan Magic Mould Co., Ltd.
2015 super quality Top quality switch and socket wall switch mould China Taizhou Huangyan
high quality custom ABS injection plastic exhaust fan mould maker China Taizhou Huangyan
high quality Plastic injection auto fan mold/exhaust fan mould/ventilation fan mould
super quality plastic home appliance extractor fan moulds factory China Taizhou Huangyan
plastic wall switch mould
1.Mould material:P20H
2.Mould Base:45#
3.Runner :cold runner
4.Design software:UG,PROE,CAD ect
5.save cost
6.Life time:500.000shots7.Customize is welcome
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
Following information is essential for your better understanding on our moulds
Name | Description |
Mould Material | P20H |
Mould Base | 45# |
Cavity | single |
Runner | cold runner runner |
Mould Design | 3D/2D Drawing |
Design Days | 3 days |
Design Software | UG,PROE,CAD,CAE,CAM,CAXA ect |
Plastic Material | PS |
Mould Life | 200,000 shots |
Injection System | eject pin |
Polish System | Mirror Polish |
Payment | 50% of Deposit by T/T,50% of Balance by T/T |
Delivery Time | 10days |
Specification | Depends on customers requirements |
Business Step
1.R&D | We support customer R&D. Make the files or improve the design if you needed |
↓↓↓ | |
2.Quotation Making | Mould Quotation will be finished in 1day according to information we get |
↓↓↓ | |
3.Negotiation | The quality ,price ,material,delivery time .payment item.ect |
↓↓↓ | |
4.Mould Design | 3-5days for mould and product 3D/2D drawing design |
↓↓↓ | |
5.Mould | According to customers' request to build the mould.Before make the mould .we send mould design to customer approval first . Mould will be usually finished in 40-50days |
↓↓↓ | |
6.Mould Testing | When moulds are finished,we will test the moulds to check it satified consumers' needs.And we will send samples for consumers' reference. |
↓↓↓ | |
7.Sampleshoot | If the first sample come out is not satisfied customer .we modify the mould and until meet customers satisfactory |
↓↓↓ | |
8.Delivery | Delivery goods by sea or by air ,according customers requirement |