350kW Water Cooled Silent 60hz Diesel Generating Set
USD $32,560 - $35,560 /Acre
Min.Order:1 Acre
Taizhou Tontek Power Technology Co., Ltd.
350kW Water Cooled Silent 60hz Diesel Generating Set
1. Specification of genset | |||||||||
Gensets model | TPD440C6 | ||||||||
Prime power | 350KW/440KVA | ||||||||
Rated Voltage(V) | 440/220 | ||||||||
Rated frequency(HZ) | 60 | ||||||||
Rated Speed(RPM) | 1800 | ||||||||
Power Factor | 0.8(lagging) | ||||||||
Dimensions(mm) (L×W×H) | 3066x1245x1990 | Open type | |||||||
Genset Weight(kg) | 3500 | ||||||||
Dimensions(mm) (L×W×H) | 4700x2100x2450 | Silent type | |||||||
Genset Weight(kg) | 5800 | ||||||||
2. Specification of diesel engine | |||||||||
Engine model | KTA19-G2 | ||||||||
Output power | 448kW/560kVA | ||||||||
Number of Cylinders | 6 | ||||||||
Cylinder arrangement | -In line | ||||||||
Cycle | Four stroke | ||||||||
Aspiration | Turbo/Aftercooled | ||||||||
Bore×Stroke (mm×mm) | 159x 159 | ||||||||
Displacement (Liter) | 18.9 | ||||||||
Compression Ratio | 13.9:1 | ||||||||
Speed Governor | Electronic | ||||||||
Cooling System | Forced Water Cooling Cycle | ||||||||
Total lubrication system capacity (L) | 50 | ||||||||
Fuel Consumption at 100% Load (g/kw.h) | 215 | ||||||||
Starting Method | DC24V electrical starting | ||||||||
3. Specification of alternator | |||||||||
Alternator brand | Stamford | ||||||||
Alternator model | HCI 4FS | ||||||||
Rated power | 320KW/400KVA | ||||||||
Number of Phase | 3 | ||||||||
Connecting Type | 3 Phase and 4 Wires | ||||||||
Number of Bearing | 1 | ||||||||
Protection Grade | IP22 | ||||||||
Altitude | ≤1000m | ||||||||
Exciter Type | Brushless ,Self-exciting, AVR automatic voltage regulating,100% Copper winding wire | ||||||||
Insulation Class | H | ||||||||
Telephone Influence Factor (TIF) | ≤50 | ||||||||
THF | ≤2% | ||||||||
Voltage Regulation, Steady State | ≤±1% | ||||||||
Transient State Voltage | ≤-15%~+20% |
Payment terms: 30% T/T as deposit, 70% balance be paid before shipment or
100% irrevocable L/C at sight
Delivery time: 5-25 days against deposit (according to specific project)