Rubber Spring, Composite Spring, Rubber with Metal coil spring
USD $10 - $50 /Piece
Min.Order:4 Pieces
Huixian Qianjin Rubber Co., Ltd.
Our company is dealing with the spring including the rubber spring
and the composite spring suitable for various vibrating equipment,
which are the elastic anti-vibration device converting the
kinetic energy into the heat energy and lost.
Comparing with the steel spring, they have advantage of
good stability, low noise, efficient vibration isolation and long service life.
1.The product damping effect is good, resonance field small, long service life, low cost.
2.Good cold resistance, excellent air tightness, water repellency, electrical insulation.
3.It is the best choice of vibration reduction
4Application:Vibration machinery, double deck bus, load truck and
other industrial machinery, rubber spring are commonly used in
mechanical equipment, vehicle running gear and suspension,
the damping and buffer action.
5.Rubber spring also can according to work need to design into various structure form
6.If you have any special requirements can be made to bear the oil rubber.
7.Damping effect is good for the product, area of small resonant, long service life,
low cost, good winter hardiness, high air tightness, water resistance,
electrical insulation, is the best choice for vibration reduction.
8.Working condition
(1) Working pressure: 0-100Mpa
(2) Reciprocating speed: ≤0.5m/s
(3) Using temperature:-40°c-+200°c(It depends on the material of elastomer)
(4) Applicable medium: hydraulic oil, water, steam, etc.
9. Merits
(1) High pressure resistence
(2) High temperature resistence
(3) Corrosion preventive
(4) The stable and seal effect of embedded trench is excellent,and the range of working temperature is wide.
(5) It is suitable to use under the most difficulty working condition.
(6) It is not influenced by the high temperature.
10.We always offer relative technical support/consultant. Quick response, all your inquiry will be replied.
11.OEM orders area highly welcome
12. Lead time of samples: 10working days.
13. delivery time: 1-2weeks
14.Payment Terms:100%TT,30% advance payment and 70% balance payment,L/C