Tunnel Type Steel Plate and Structural Steel Pretreatment System
USD $10,000 - $100,000 /Set
Min.Order:1 Set
Chongqing Hi-Sea Marine Equipment Import & Export Co., Ltd.
Pretreatment System
Tunnel Type Steel Plate and Structural Steel Pretreatment System
The tunnel type steel plate pretreatment system is designed as complete surface preparation for steel plates, beams, profiles, flat bars, and tubes. The plate ranging from 1 meter to 5 meter wide. This is a continuous process with material loading, take raw steel and place it on the input conveyor and then take blasted, cleaned, automatic painted, dry plate and take off at the other end.
A complete system include: Roller conveyors, Blasting chamber, Abrasives recovery system, Abrasives separator & Storage hopper, Abrasives cleaning system, Dust collector, Automatic Spray paint booth and Drying oven.
The blasting part adopts centrifugal high-efficient blast wheel, mechanical and continuous abrasive handling and reclamation. The cleaning part adopts high quality rotary brush and high pressure blower blow off. Automatic spray painting system adopts high pressure airless spray methods. The preheating and drying part adopt various heating methods, such as electric and gas etc. The complete automatic system is controlled by PLC with full interlock safety system provided.
Assembly line overall performance
Description | Unit | Details | |||
Steel Plate Size | Width | m | ≤1200m | ||
Length | m | 6~12m | |||
Thickness | mm | 6~60mm | |||
Structural Steel Size | mm | 18000×200×200 | |||
Roller Delivery Speed | m/min | 1~5 | |||
Work Speed | Degree of Steel Plate Corrosion (A) | m/min | 3.6 | ||
Degree of Steel Plate Corrosion (B) | 3 | ||||
Degree of Structural Steel Corrosion (A) | 2.4 | ||||
Degree of Structural Steel Corrosion (B) | 2 | ||||
Derusting Quality Grade |
| BSa2.5(GB8923-88 orISO8501-1,1988) | |||
Surface Roughness | μ | 12.5~50 | |||
Film Thickness | μ | 15~25 | |||
Material and Intensity Range of Workpieces |
| Marine A, B, and D steel;AH32, AH36, DH32, DH36 | |||
Supply | Power | kw | ≤250kw | ||
Compressor Air | m3/min | 6~7 | |||
Pressure of Compressor Air | MPa | 0.4~0.6 | |||
Work Capacity per Year | t | 48000 |
General Working Proces
General Drawing