GGD Low Voltage Withdrawable Switchgear
USD $2,000 - $30,000 /Set
Min.Order:1 Set
Shouguang Juneng Electric Co., Ltd.
GGD Low Voltage WITHDRAWABLE SWITCHGEAR
ABOUT SHOUGUANG JUNENG ELECTRIC CO., LTD
PRODUCT FEATURES
Model
Service Condition
Discription
1. GGD low voltage distribution cabinet is used for power plants, substations, factories and mines, power users exchange 50Hz, rated working voltage 380V, rated current up to 3150A of the distribution system as a power, lighting and power distribution equipment, power conversion, distribution and control.
2. GGD low-voltage distribution cabinet is a new low-voltage distribution cabinet according to the requirements of the competent superiors of the Department of Energy and the majority of electricity users and the design department, in a safe.economic, reasonable, reliable design principles. The product has a high segmentation, dynamic and thermal stability, electrical program is flexible, convenient combination series, ractical, novel structure, high protection class. Can be used as the replacement of low voltage switchgear products.
3. Protection grade is IP30. IP20-IP40 could be optional acc to the requirements of service condition.
4.Good appearance. easy assembly and disassembly.
5. Main technical parameter
Model No | Rated voltage(v) | Rated current(A) | Rated short-time breaking current(kA) | Rated short-time withstand current(1s)(kA) | Rated peak withstand current (kA) | |
GGD1 | 380 | A | 1000 | 15 | 15 | 30 |
B | 600(630) | |||||
C | 400 | |||||
GGD2 | 380 | A | 1500 | 30 | 30 | 63 |
B | 1000 | |||||
C |
| |||||
GGD3 | 380 | A | 3150 | 50 | 50 | 105 |
B | 2500 | |||||
C | 2000 |
6. Overall dimension (MM)
Model | H | W | D |
GGD1 GGD2 | 2200 | 600/800/1000 | 600 |
GGD3 | 2200 | 800/1000/1200 | 600/800 |
7. Cabinet sketch map
8. Payment & Packing
1).payment terms: T/T or L/C
2).packing detail:
Exporting Standard Packing: plastic bag + kraft paper + carton + plywood pallets; Wrap bags+ carton + plywood pallets or according to your personalized requirements.
3).delivery time: usually within 30 days after the deposit
WHAT WE CAN DO BETTER
Our Main Switchgear
Our Main Equipment in Switch Panel Plant
Our Processing and Assembly
Our Test and Inspection to Every Batch before Delivery
Our Packing and Delivery
Our Main Certificate
Our Service
Any inquiry or question, pls contact me