PPGI Coils From China
USD $500 - $1,000 /Ton
Min.Order:25 Tons
Product name | PPGI Coils From China |
thickness | 0.12-1.2mm |
width | 600-1250mm |
zinc coating | 40g-275g |
standard | ASTM,ASIS,DIN,GB |
material | CGCC |
technique | hot dipped |
packing | export standard |
payment | TT/LC |
min order | 25tons(one 20ft FCL) |
delivery time | 7-30days |
1.15 years production experience.
duct be exported to more than 30 countries
3. 2 prepainted galvanized steel production lines and 2 galvanized steel production line
1.Each bare coil to be securely tied with two bands through the eye of coil (or not) and one circumferential.
2.The contact points of these bands on the coil edge to be protect with edge protectors.
3.Coil to be properly wrapped with water proof /resistant paper, it then to be properly and completely metal wrapped.
4.Wooden and iron pallet can be used or as your requirements.
5.And each packed coil to be properly wrapped with band, three-six such band through the eye of coil at about equal distance, and two-four such bands securely tied around belly of coil at about equal distance
1.What is recommendation?
Asia: Thickness:0.18 / 0.19 / 0.21 / 0.24 / 0.26mm width 914/1000/1250mm,high gloss red, high gloss brown, clear varnish
Africa:Thickness0.25 / 0.26 / 0.27 / 0.28 / 0.3 / 0.38 / 0.4 / 0.45mm with 762/914/1000 /1250 mm width,red,green,blue,white
South America:Thickness 0.12 / 0.14 / 0.16 / 0.35 / 0.49mm with 914/1000 / 1220mm, red,green and blue color
2.What s the payment term?
30-50% TT in advance(based on your qty ), 70% balance against copy B/L in 7 workdays.
3.When will you arrange production?
In 7 workdays when we receive your advance payment.
4. When will you send BL copy?
In 3-5 workdays after shipment date.
5. When will you send original Documents?
In 3-5 workdays when we get the balance.
6. From we pay the advance to we get the goods what other service you can provide?
A Send photos from raw material to shipment.
B Notice and remind you when will you get the goods.
C Advise or Solve when you meet the problem during your production