China supplier prepainted galvanized steel coil Color coated galvanized steel coil (CGCC,SGCC,PPGI ,PPGL)
USD $500 - $600 /Metric Ton
Min.Order:25 Metric Tons
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1.Each bare coil to be securely tied with two bands through the eye of coil (or not) and one circumferential. 2.The contact points of these bands on the coil edge to be protect with edge protectors.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1. Producing various specification and models and national standards of galvanized steel sheet 2. Using high-quality material and advanced production technology and equipment for processing 3. Applicable to a humid climate and the harsh corrosive environment 4. Exported to Europe, North American, the Middle East,the South East Asia, Africa, Asia,European and other countries and regions, well received by our buyrer.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1.What is recommendation? Asia: Thickness:0.18 / 0.19 / 0.21 / 0.24 / 0.26mm width 914/1000/1250mm,high gloss red, high gloss brown, clear varnish Africa:Thickness0.25 / 0.26 / 0.27 / 0.28 / 0.3 / 0.38 / 0.4 / 0.45mm with 762/914/1000 /1250 mm width,red,green,blue,white South America:Thickness 0.12 / 0.14 / 0.16 / 0.35 / 0.49mm with 914/1000 / 1220mm, red,green and blue color
2.What s the payment term? 30-50% TT in advance(based on your qty ), 70% balance against copy B/L in 7 workdays.
3.When will you arrange production? In 7 workdays when we receive your advance payment.
4. When will you send BL copy? In 3-5 workdays after shipment date.
5. When will you send original Documents? In 3-5 workdays when we get the balance.
6. From we pay the advance to we get the goods what other service you can provide? A Send photos from raw material to shipment. B Notice and remind you when will you get the goods. C Advise or Solve when you meet the problem during your production
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|