Good quality cold rolled galvanized steel coil
USD $500 - $1,000 /Ton
Min.Order:25 Tons
Specification | ||
Name | GI steel coil | GL steel coil /Anti-Finger |
Standard | GB/T-2518 JIS G 3302 EN 10142/10427 ASTM A653 | GB/T-14798 JIS G 3321 EN 10215 ASTM 792 |
Grade | SGCC DX51D+Z | SGLCC DX51D+AZ |
Thickness | 0.12-2.0mm (±0.02mm) | 0.16-0.7mm(±0.02mm) |
Width | 30-1250mm (±2mm) | |
Length | Coil or as Customers' requirement | |
Zinc/Aluzinc coating | Zn 40g/sm-275g/sm | Alu-zinc 40-150g/sm |
Spangle | Zero/Mini/Regular/Big | Regular |
Coil weight | 3-5tons or As your requirement | |
Hardness | CQ/FH/As your requirement (G300-G550) | |
Surface Treatment | Anti-Finger printing ,Chromated, oiled/ non-oiled | |
Certification | ISO9001,BV,SGS, | |
Application | Structural use ,roofing, corrugated roofing, commercial use, household appliance, industry. |
1.Each bare coil to be securely tied with two bands through the eye of coil(or not) and one circumferential.
2.The contact points of these bands on the coil edge to be protected with edge protectors.
3.Coil to be properly wrapped with water proof/resistant paper,it then to be properly and completely metal wrapped.
4.Wooden and iron pallet can be used or as your requirements.
5.And each packed coil to be properly wrapped with bands,three-six such band through the eye of coil at about equal distance,and two-four such bands securely tired around belly of coil at about equal distance.
1.15years production experience
2.Product be exported to more than 30 countries
3.2 prepainted galvanized steel production lines and 2 galvanized steel
1.What is recommendation?
Aisa:Thickness:0.18/0.19/0.21/0.240.26mm width 914/1000/1250mm,high gloss red,high gross brown,clear varnish
Afraic:Thickness 0.25/0.26/0.27/0.28/0.3/0.38/0.4/0.45mm with 762/914/1000/1220mm width,red,green,blue,white
South Afraic:Thickness 0.12/0.14/0.16/0.35/0.49mm with 914/1000/1220,red,green and blue color
2.What's the payment term?
30-50% TT in advance(based on your qty),70% balance against copy B/L in 7 workdays.
3.When will you arrange production?
In 7 workdays when we receive your advance payment.
4.When will you send B/L copy?
In 3-5 workdays after shipment date.
5.When will you send original Documents?
In 3-5 workdays when we get the balance.
6.From we pay the advance to we get the goods what other service you can provide?
A.Send photos from raw material to shipment.
B.Notice and remind you when will you get the goods.
C.Advise or solve when you meet the problem during your production.
Contact us:
E-mail:sales29 at
Telephone:15306432688
Skype:camelsteel29