high power energy-saving120w waterproof led tunnel lights
USD $150 - $170 /Piece
Min.Order:200 Pieces
Shenzhen GF Technology Development Ltd.
high power energy-saving120w waterproof led tunnel lights
Advantages of high power energy-saving120w waterproof led tunnel lights
1. Adopt high light efficiency light source, >100lm/W
2. Stable and low decay.
3. The Tj for LED is less than 85°C;
4. Lifespan up to 50000hrs.
5. Energy saving, excellent heat disspation.
6. ECO-friendly, mercury free, lead free.
7. Low maintenance and replacement costs;
8. Fixture surface with anti-static spray, improved
resistance to acid, anticorrosive.
9. PF > 0.95.
Specifications of high power energy-saving120w waterproof led tunnel lights
Model | LED Type | Color | Voltage | Beam Angle | Wattage | Lumen (lm) | CRI (Ra) | PF | IP factor |
SPC120H2-120W | 2 pcs COB | CW | AC85-265V | 120° | 120W±10% | 11613±15% | 70-80 | ≥0.95 | IP65 |
DW | AC85-265V | 120° | 120W±10% | 11000±15% | 70-80 | ≥0.95 | IP65 | ||
NW | AC85-265V | 120° | 120W±10% | 10600±15% | 70-80 | ≥0.95 | IP65 | ||
WW | AC85-265V | 120° | 120W±10% | 10174±15% | 70-80 | ≥0.95 | IP65 | ||
Remarks: | |||||||||
1. Available color temperature CCT: CW:5500-6500K, DW:4700-5300K, NW:4000-4500K, WW:3000-3500K. | |||||||||
2. Lumen is based on the condition of Ta<25℃ with a tolerance of ±15 %. |
Lighting distribution Curve:
Application of high power energy-saving120w waterproof led tunnel lights
1. Indoor & outdoor project lighting;
2. Suitable for workshop, factory, warehouse, toll station, gas station, supermarkets, exhibition center, stadium and other places.
Package of high power energy-saving120w waterproof led tunnel lights
1. Net weight:11.95 kgs
2. Outer carton size:670x360x275mm
3. Q'ty per ctn:1 pcs
4. G.W per ctn:13.23 kgs
Replying your inquiry within 24 hours
Consultation from professional and experienced staff
Providing 1-3 years warranty
Solid pakage & fast delivery & newly tracking mews
OEM is welcome. Providing customized service.
Golden Future Enterprise HK LTD. is a specialist on the design and selling of LED industry lighting for more than 10 years,especially for miner lamp, explosion proof lighting fixture, led street light and other led commercial lightings,and etc.
Please do not hesitaye to contact us if you need led application products or need to develop new products.
Q: 1. What is the lead time?
A:Sample needs 7-10days, mass production time needs 25-30days.
Q: 2. Do you have any MOQ limit?
A: Our MOQ EXW is 1 pc for sample; MOQ FOB is 200pcs.(Depends on different type battery/battery pack)
Q: 3. How do you ship the goods and how long does it take arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 5-7 days to arrive.
Q: 4. How to proceed the order when customer order products?
A: Inquiry-Confirmation-Send Proforma Invoice-Customer make payment-Arrange production-ship the goods to customers-Confirmation-Finish.
Q: 5. How to make this payment?
A: TT, Paypal, Western Union.
Q: 6. Do you offer guarantee for the products?
A: Yes, we offer one year guarantee for the products.
Q: 7. Do you accept OEM/ODM?
A: Yes, it’s available