outdoor garden Rattan daybed furniture
USD $100 - $300 /Set
Min.Order:6 Sets
Foshan Shunde Maryard Furniture Co., Ltd.
outdoor garden Rattan daybed furniture
1)Sturdy aluminum frame with powder coated
2)UV-stabilized resin rattan
3)Water waterproof
Outdoor Furniture Garden Furniture Set
1.Synthetic PE rattan with aluminum frame
2.UV-Resistant,Weatherproof
3. Certificate: SGS Test
Material introduction:
1) Aluminium: brand-new aluminium, not recycled. 1.2-1.5mm thickness.
2) Powder coating: all frames will be treated by powder coating. the color follows the wicker color so that it keeps the same tone from outside to inside.
3) High qulity PErattan. toxication, washablility, scalability, UV and corrosion resistance .
4) cushion: 25 density foam
5) Fabric : 100% polyester , UV and water resistance.
1.Material:
1) Frame: Top grade aluminum frame with powder-coated, light, strong and resistant.
--The thickness of aluminum tube is 1.2mm 1.5, 1.8mm .
Diameter in circle: 28, 25, 22, 19, 16mm,
Diameter in square: 50*50, 40*40, 25*25, 20*20, 30*19, 15*15mm,which are depend on the design and what’s needed.
2) Rattan: PE Rattan without recycled material, durable and UV resistant, color is optional.As your requirement(Charcoal,dark brown,chocolate,cream,beige ect)
--Flat rattan the width is 8mm 6, 10,12 mm.
--Round rattan: diameter is 3mm.
*Material Information
1. Raw Material: 100% HDPE (High Density Polyethylene)
2. UVA: Ultraviolet-Anti
3. Coloring Materials: Color Master Batch and Color Powder, high concentration of pigments, good dispersing agency, heat-resistance
*The Information of KG into Meter:
Rattn Size: | Weight: g/m | How many grams of 1 meter | How many meters of 1 kg | How many kg of 1 square meter |
8*1.2 | 7.7 | 7.7 | 130 | 1.7 |
8*1.3 | 8.2 | 8.2 | 122 | 1.7 |
8*1.4 | 8.6 | 8.6 | 117 | 1.9 |
8*2.5 | 9.4 | 9.4 | 108 | 2.1 |
9*1.4 | 9 | 9 | 112 | 2 |
9.5*1.3 | 9.1 | 9.1 | 110 | 2.1 |
9*1.6 | 9.2 | 9.2 | 108 | 2.1 |
Dia. 5 | 8.4 | 8.4 | 119 | 2.5 |
Payment terms
T/T, 30% deposit before placing an order,
the balance of 70% should be paid off before loading.
Production Lead Time:
1. High Season (September to April): 35-60 days
2. Low Season (May to August): around 20-35days