best seller gray thermal grease/paste/compound with tube
USD $0.05 - $50 /Piece
Min.Order:100 Pieces
Shenzhen Halnziye Electronic Co., Ltd.
msds best cost performance CPU conductive silicone compound/paste/grease tube
msds best cost performance conductive silicone compound/paste/grease tube for pc
best seller cpu conductive thermal compound/paste of halnziye hy510 tube
msds best cost performance conductive waterproof silicone compound/paste/grease tube for pc
il-liquide&excellent performance gray grease / paste / compound for cpu cooling HY500
Product Description
Best cost performance high thermal conductivity thermal cpu paste/grease/compounds
Ideal for all of the CPU cooler and LED heat sink
these series are optimized for a wide range of bond lines between modern CPUs and high performance heat-sinks or water-cooling solutions.
Used for CPU and other electronics parts
Specification
Items | HY510 | HY520 | HY530 | HY550 | Unit |
Thermal conductivity | >1.93 | >2.3 | >2.5 | >2.7 | W/m-K |
Thermal Impedance | <0.225 | <0.214 | <0.126 | <0.105 | °C-in2/W |
Gravity | >2.4 | >2.5 | >2.63 | >2.76 | g/cm3 |
Viscosity | 1000 | 1000 | 1000 | 1000 | No |
Thixotropic Index | 380±10 | 350±10 | 320±10 | 300±10 | 1/10mm |
Operation Temperature(Peak) | -30~240 | -30~240 | -30~240 | -30~240 | °C |
| -50~280 | -50~280 | -50~280 | -50~280 | °C |
Our Service
1.Gurantee Period: 2 years
2.Express Door to Door Service
3.Payment:T/T Pay-pal Western Union
4.OEM&ODM
5.Products Exchange & Returns
(you should provide pictures or video or testing data to confirm that it is our products' problem)
About US
We, Shenzhen Halnziye Co., Ltd. are senior Thermal Grease manufacturer in China for years, our main products are heat sink compounds & heat sink plaster & heat sink flow and thermal pad, our products are widely used in CPU&VGA, LED, IC etc, with great operating property of our products (all products got SGS, Rosh certification), and our main markets are EU, north America, Northeast Asia, Southeast Asia etc, I believe you will find what you want to order with the best cost performance.
FAQ
1>Lead time:
Less than or be equal to 1000pcs In 3 working days;other quantity depends on arranging of our factory.
2>Delivery period: 3~5 working by Express door to door service and airport to airport service, if by ship, it depends on schedule and destination.
3>All Emails will be answered in 12 hours, if you do not receive our reply,please send it again and we will reply as soon as possible.
4>Any other question ,no hesitate to contact us