EPS foam machining center, CNC Router 5 axis, CNC ROUTER MACHINE
USD $19,000 - $40,000 /Set
Min.Order:1 Set
EPS foam machining center, CNC Router 5 axis, CNC ROUTER MACHINE
1.Machine Introduction
Heavy and strong machine structure
Top-quality and precision imported ball bearings
Imported wide linear rails and helical racks
Adopt Europe OSAI numerical control system, high machining accuracy and high speed.
2.Application
1) Wood, EPS and non-metallic carbon hybrid materials.
2) Die and mold industries:
Non-metallic mold: the machine is particularly suitable for automotive foam mold, wooden ship model, wooden model aviation, trains and other wooden mold.
3) Musical instrument industry:
Can carve three dimension musical instrument, contour cutting
3.Performance Parameter
Our Services
1. Technical support by phone, e-mail or MSN around the clock.
2. Friendly English version manual and operation video CD disk.
3.The machine's warranty is 12 months since the date of comission.
FAQ
1. Guarantee & After-sale Service?
1.1 One year warranty ;
1.2 Technical support by Phone, Email, Skype, WhatsApp and so on;
1.3 Free Training to make sure you master the operation of the CNC Router;
2. OEM Service Available?
2.1 We can make the special machines according to your requirements and with your brands..
3. Delivery Time( Production Procedure)?
3.1 For 3 Axis Machine, 15 days;
3.2 For 4 Axis Machine, 35 days;
3.3 For 5 Axis Machine, 90 days.
4. Payment Terms?
4.1 T/T in advance;
5. How to Order?
5.1 Consult: According to your requirements we suggest the most suit machines to you, with best quality and competitive price;
5.2 Process Evaluation: Evaluate and discuss all the details(including technical parameters, specifications and business terms) of the order to exclude any misunderstanding;
5.3 Placing Order: Sing sales contract;
5.4 Production: We will arrange the production as soon as receiving the prepayment. The machine will be finished on time;
5.5 Quality Control: The whole production procedure will be under regular inspection and strict quality control. The complete machine will be tested to make sure they can work very well before being out of factory;
5.6 Delivery: We will arrange the delivery as the terms we both agreed with.