SIEMENS PLC control - 5 tons Plate Ice Maker For Fishery
USD $10,000 - $100,000 /Set
Min.Order:1 Set
Guangzhou Koller R & E Co., Ltd.
Hot sale express Plate Ice Machine With PLC System 5000kg/day from China Koller
Koller 2 tons New design plate ice machine for fishery by trade assurance supplier
2000KG Widely Applied Plate Ice Maker with Ice Crusher for Food Processing
10 tons High Quality Plate Ice Plant with Ice Crusher for Fishery
5000KG HYF Plate Ice Machine for Fishery
Product Description:
1.Unique Structure: having owned two unique technologies: flat-plate heat exchange technology & circulating hot gas for ice dropping technology.
2.Quality advantages: the evaporator of plate ice machine is for falling film plate, its material is stainless steel 304 with stable chemical properties, and reasonable evaporator structure.
3.Prominent in energy saving: only 60 KW power per one ton plate ice, can save power greatly.
4.Easy operation, PLC editable control, only need to select and confirm the capacity, other procedures will be automatically finished under PLC program control, no need skilled workers to monitor.
Plate ice machine unit
Plate ice
HYF50 Plate Ice Machine With Stainless Steel 304
Main Components:
Item | Name of Components | Brand Name | Original Country |
1 | Compressor | BITZER | Germany |
2 | Ice Maker Evaporator Grid | KOLLER |
China |
3 | Water cooled condenser | KOLLER | |
4 | Refrigeration components | DANFOSS/CASTAL | Demark/Italy |
5 | PLC Program control | SIMENS | Germany |
6 | Electrical components | LG (LS) | South Korea |
Cooling System: Water Cooling System
HYF50 plate ice machine: 2100mm * 1910mm * 2090mm
The Cooling Tower: 1680mm * 1680mm * 1800mm
Installation:
1). Installing by the user: we will tested and install well the machine before shipment, all necessary spare parts, operation manual and CD are provided to guide the installation.
2). Installing by Koller engineers:
(1) We can send our engineer to assist the installation and provide technical support and train your workers. The end-user provide accommodation and round-trip ticket for our engineer.
(2) Before our engineer arrived in your site, the installation place, electricity, water and installation tools should be ready. Meanwhile, we will provide you a Tool List with the machine when delivery.
(3) All spare parts are provided according to our standard. During installation period, any shortage of parts due to the actual installation site, the buyer is required to afford the cost, such as water pipes.
(4) 2~ 3 workers are required to assist the installation for big project.
(5) Any delay due to customer’s reason, it will be charged from the 8th day, USD100/day for one person as installation fee. Free of charge for one week.
Guarantee Period:
During 12 months after selling, maintenance and parts free of charge.
Certification: